At the research center, design and simulation work has been carried out over the past 6 weeks to develop a new product.
After several design changes, structural analysis, and testing and validation, the final design has been confirmed. Now the next stage begins: reviewing the completed design in an actual production environment.
DESIGN & ENGINEERING CENTERProduct development project, Rev.08
Project duration
6 weeks
Final design version
Rev.08
Data generated in this project
3D models and design data640 GBCAD models, Assemblies, Drawings
Overseas, tomorrow's work has already been prepared.
The overseas engineering center plans to review the production feasibility of the new product from 9:00 AM tomorrow.
12 engineers will take part, including those responsible for product design, production processes and quality control. The work environment and test equipment for receiving and reviewing the design data are also ready.
OVERSEAS ENGINEERING CENTERTomorrow's work schedule
Product A, Production feasibility reviewIn overseas local time
07:00Project data readiness deadlineData received and ready for use
09:00Production engineering review meeting12 design and production engineers
10:30Design data analysisReview of product structure and production conditions
13:00Simulation result validationComparison of test and production conditions
15:00Production feasibility reviewCheck of production processes and equipment conditions
17:00Review results summaryPreparing materials for the research center
Work readiness
Participating engineers12 confirmed
Test and validation equipmentReserved
Analysis softwareReady
Receiving storageSufficient space secured
Project dataAwaiting arrival
The data must be ready by 7:00 AM.
Time is needed before work starts at 9:00 AM to check the files and the software environment.
Live contextNow
16:15Research center time
Overseas, tomorrow's work has already been prepared.
12 engineers will take part in the production feasibility review. Test equipment and the analysis environment are also ready. The data must arrive two hours before work begins.
The file size is 3TB. But the time available is limited.
The two sites are about 9,000km apart, and the overseas engineering center is in a time zone 8 hours behind the research center.
Research center time
16:0023:0006:0015:0017:00
Data delivery and preparationCheck
08:0015:0022:0007:0009:00
Overseas local time
Design completeWork begins
3 TB
Total data
23 h
Until the data readiness deadline
2 h
Check time before work begins
INNORIX in PracticeScene 3 / 12
Transfer preparation16:30
Today 4:30 PMScene 3 / 12
How long will it take to deliver 3TB?
The company's existing network is in place between the research center and the overseas engineering center.
However, the network's maximum line speed does not translate directly into file transfer speed. The effects of network latency from the distance between the sites, packet loss, and network capacity used by other work must be taken into account. The person in charge checks the required transfer speed and the network environment actually available.
TRANSFER TIME ESTIMATIONArrival time depends on the available transfer speed
Data to deliver
3 TB
Available time, transfer starting 17:00
22 h
Estimated net transfer time8 h 20 min
Margin before the data readiness deadline13 h 40 min
If the selected average effective speed is maintained, the data can be delivered within the data readiness deadline.
This is the theoretical transfer time with 3TB calculated in decimal units. It does not include additional time for file scanning, preparation, verification, connection interruptions and the like.
Review for a long-distance transfer environment
Even for the same 3TB of data, the time required differs with the actual transfer environment.
Average effective transfer speed
Time to transfer 3TB
100 Mbps
66 h 40 min
200 Mbps
33 h 20 min
400 Mbps
16 h 40 min
800 Mbps
8 h 20 min
1 Gbps
6 h 40 min
Delivering 3TB within 22 hours requires an average effective transfer speed of at least about 303Mbps. In actual operation, a sufficient margin must be secured to allow for additional work and network fluctuations.
The company reviews the actual transfer conditions, including INNORIX Hyperlane, which can be used on long-distance networks.
Live contextNow
16:30Research center time
By when can 3TB of data be delivered?
The available network capacity at both sites and the time needed for the transfer are reviewed. 22 hours 30 minutes remain until the data arrival deadline.
Until work begins24 h 30 min
Data to deliver3.00 TB
Delivered0.00 TB
Remaining data3.00 TB
Current transfer statusReviewing transfer environment
Besides the final design data, the research center holds countless intermediate design files and temporary calculation results.
What the overseas engineering center needs is not the data from the entire development process, but the confirmed design version and the related materials needed to review it. The person in charge checks the final project folder and the transfer targets.
Besides the final design data, the research center holds countless intermediate design files and temporary calculation results. Only the confirmed design version and the related materials needed to review it are set as the transfer target.
Until work begins24 h 15 min
Data to deliver3.00 TB
Delivered0.00 TB
Remaining data3.00 TB
Current transfer statusConfirming transfer target
Overseas engineering center
Preparing receiving storage
Next task
Start the transfer to the overseas engineering center
Data delivery to the overseas engineering center begins.
The research center's file server and the overseas engineering center's server are connected for the transfer.
The delivery target and the scope of the data have been confirmed, and space in the receiving storage has been checked. 3TB of project data begins to move directly between the two sites.
The results of the first hour of transfer are checked.
One hour has passed since the transfer started.
The person in charge checks the size of the data actually delivered and the transfer speed. If the transfer continues at the current speed, the data is expected to arrive well before the time the overseas engineering center needs it.
FIRST HOUR OF TRANSFERActual transfer results are checked, not estimated times.
Delivered
420 GB
Average effective speed
933 Mbps
Transfer progress
14%
Mbps
02505007501000
17:0017:1517:3017:4518:00
Example of the change in effective transfer speed during the first hour
Total project data
3.00 TB
Remaining data
2.58 TB
Expected completion at current average speed
Around next day 00:09
Data readiness deadline
Next day 15:00
Live contextNow
18:00Research center time
Can it be delivered within the expected time?
The data actually delivered and the average speed during the first hour are checked. The expected completion time is reviewed based on the current transfer results.
Many tasks are running at the same time at the research center and the overseas engineering center.
As routine server-to-server data transfers, business system use and nightly backups begin, the network capacity available for the project transfer changes as well. The transfer speed is lower than at the start, but data delivery continues.
SHARED ENTERPRISE NETWORKMany tasks running on one enterprise network
Hourly network usage, example of a 1Gbps lineProject data transferOther enterprise network use
Mbps
02505007501000
17:0018:0019:0020:0021:0022:0023:0000:00
Delivered
1.15 TB
Remaining data
1.85 TB
Transfer progress
38.3%
Transfer performance varies with the company's actual network usage conditions. The network use of existing work is also taken into account when setting up transfer jobs.
Live contextNow
20:00Research center time
The two sites do not operate for this project alone.
Nightly backups and routine data transfer work begin. The available network bandwidth changes as well.
The research center's day is over. But the data for tomorrow's work is still moving.
Research center 23:00Today's R&D work finishedProject staff have gone home
Overseas engineering center 15:00Today's regular work in progressReceiving data for tomorrow's review
PROJECT DATA TRANSFERTransferring
2.08 TB / 3.00 TB69.3%
Transfer continues after the research center staff leave
Until work begins
18 h
Remaining data
0.92 TB
Overseas engineering center
Reception in progress
Next task
Deliver remaining data
Data keeps moving even after people have gone home.
The staff at the research center have left for the day. The transfer keeps running, and its progress is recorded.
INNORIX in PracticeScene 8 / 12
Data arrivalNext day 01:10
Next day 1:10 AMScene 8 / 12
All project data has been delivered.
8 hours 10 minutes have passed since the transfer started.
The 3TB of project data completed at the research center has been delivered to the designated storage at the overseas engineering center. There is still plenty of time before work begins at the overseas engineering center.
COMPLETE TRANSFER HISTORY01:10Completed
Delivered
3.00 TB
Remaining data
0.00 TB
0.0 TB0.5 TB1.0 TB1.5 TB2.0 TB2.5 TB3.0 TB
17:0018:0020:0023:0000:0001:10
Transfer started
17:00
Transfer complete
01:10
Total duration
8 h 10 min
Live contextNow
Next day 01:10Research center time
All target files have arrived at the overseas engineering center.
The transfer is complete. Records remain so that the target files and transfer results can be checked.
Morning begins at the overseas engineering center.
The project data completed at the research center yesterday has already arrived in the storage here.
PROJECT DATA AVAILABLEProduct_A / Rev08
Final_CAD_Models/640 GB
Simulation_Results/1.82 TB
Test_and_Validation/480 GB
Technical_Documents/60 GB
3.00 TBReceived
13 h 50 min
Arrived ahead of the data readiness deadline
3 h
Time now remaining until work begins
INNORIX in PracticeScene 10 / 12
Preparing to start workNext day 14:00
Overseas local time 6:00 AMScene 10 / 12
The data is checked before work begins.
The staff member at the overseas engineering center checks the project data needed for the review.
They confirm that the design version is the same as the project version used at the research center, and open the files in the applications needed for the work.
PREPARATION FOR PRODUCTION REVIEWProject data to be used today
Items checked by the overseas engineering center staff
Final design version Rev.08 confirmedChecked
Full composition of the project data confirmedChecked
Design files opened and reference files checkedChecked
Access to simulation results confirmedChecked
Test and technical documents checkedChecked
Production engineering review environment preparedChecked
Local time 07:00Ready for work
Live contextNow
Next day 14:00Research center time
Overseas staff check the data before work begins.
They check the received project data and approved version, the composition of the required files, and whether they can be used in the work applications.
12 engineers begin the production engineering review.
The design data completed at the research center is now used as material for new work at the overseas engineering center. The engineers analyze the product structure and production conditions, and compare the simulation results with the actual production environment.
This time, new data has been created at the overseas site.
The day's production engineering review is complete.
The overseas engineering center has produced review results based on production conditions, design change requests and additional simulation data. These materials will in turn be used for the next design work at the research center.
ENGINEERING REVIEW RESULTSProduct A, Production review results
Production feasibility review results4 GBProduction review reports
Additional analysis and validation data156 GBEngineering validation results
New data to deliver to the research center 184 GB
SourceOverseas Engineering Center
DestinationR&D Center
Data completed at one site starts the work at another site, and the new results produced there are used again for the next work.
Live contextNow
Day after next 01:00Research center time
New data has been created at the overseas site.
The day's production engineering review is complete. The review results, design change requests and additional simulation data will in turn be used for the next design work at the research center.
Until work beginsWork begins
Data to deliver3.00 TB
Delivered3.00 TB
Remaining data0.00 TB
Current transfer statusCompleted
Overseas engineering center
Production engineering review complete
Next task
Next design work at the research center
OVERSEAS ENGINEERING CENTER
Production review
Product design dataAvailable
Simulation resultsAvailable
Test and validation dataAvailable
Technical documentsAvailable
Production engineering review complete
FROM DESIGN TO PRODUCTION
The design completed at the research center yesterday started new work overseas today.
YESTERDAY, 16:00Research center
Design work complete The result of 6 weeks of R&D work
TODAY, 09:00, LOCAL TIMEOverseas engineering center
Production engineering review begins New work starting from the same project data
3 TB
Project data delivered
9,000km
Distance between sites
On schedule
Start of the next work
In a company, data is not simply a file to be delivered. It is the result of work someone has completed, and the foundation of work someone else must begin.
Files need to arrive because there is work to be done there.INNORIX
THE TECHNOLOGY BEHIND THIS STORY
Inter-Site Transfer
INNORIX, which delivers large volumes of business data between a company's research centers, production facilities, headquarters and overseas sites, and builds an environment for continuous collaboration.