INNORIX in Practice, Inter-Site Transfer

The 3TB of design data completed at the research center
must be used overseas tomorrow.

Design work carried out over several weeks was completed today.
Tomorrow, another site will begin new work based on this data.

Distance between sites
About 9,000km
Data to deliver
3 TB
Until work begins
25 h

DESIGN & ENGINEERING CENTER

Today 16:00Design work complete

  • Product design data640 GB
  • Simulation results1.82 TB
  • Test and validation data480 GB
  • Technical documents60 GB

3.00 TBProject data to deliver

OVERSEAS ENGINEERING CENTER

Tomorrow 09:00Production engineering review begins

  • Review engineers12
  • Test equipmentReserved
  • Review scheduleConfirmed
  • Design dataAwaiting arrival

Production reviewWork starting tomorrow

Work at the research center is done. Work at the overseas engineering center has not yet begun.

INNORIX in PracticeScene 1 / 12

Design work complete16:00

Today 4:00 PMScene 1 / 12

Weeks of design work have been completed.

At the research center, design and simulation work has been carried out over the past 6 weeks to develop a new product.

After several design changes, structural analysis, and testing and validation, the final design has been confirmed. Now the next stage begins: reviewing the completed design in an actual production environment.

DESIGN & ENGINEERING CENTERProduct development project, Rev.08

Project duration
6 weeks
Final design version
Rev.08

Data generated in this project

  • 3D models and design data640 GBCAD models, Assemblies, Drawings
  • Simulation results1.82 TBStructural analysis, Thermal analysis
  • Test and validation data480 GBTest results, Measurement data
  • Technical documents60 GBSpecifications, Engineering reports

Total data size 3.00 TBDesign work complete

Live contextNow

16:00Research center time

Weeks of design work have been completed.

The research center has completed product design and simulation work. The project data to be delivered to the overseas engineering center totals 3TB.

Until work begins25 h

  • Data to deliver3.00 TB
  • Delivered0.00 TB
  • Remaining data3.00 TB
  • Current transfer statusPreparing transfer
Overseas engineering center
Review schedule confirmed
Next task
Confirm scope of design data to deliver

PROJECT DATA3.00 TB

  • Product design640 GB
  • Simulation1.82 TB
  • Test and validation480 GB
  • Technical documents60 GB
Next story, Today 4:15 PMOverseas, tomorrow's work has already been prepared. →

Today 4:15 PMScene 2 / 12

Overseas, tomorrow's work has already been prepared.

The overseas engineering center plans to review the production feasibility of the new product from 9:00 AM tomorrow.

12 engineers will take part, including those responsible for product design, production processes and quality control. The work environment and test equipment for receiving and reviewing the design data are also ready.

OVERSEAS ENGINEERING CENTERTomorrow's work schedule

Product A, Production feasibility reviewIn overseas local time

  1. 07:00Project data readiness deadlineData received and ready for use
  2. 09:00Production engineering review meeting12 design and production engineers
  3. 10:30Design data analysisReview of product structure and production conditions
  4. 13:00Simulation result validationComparison of test and production conditions
  5. 15:00Production feasibility reviewCheck of production processes and equipment conditions
  6. 17:00Review results summaryPreparing materials for the research center

Work readiness

  • Participating engineers12 confirmed
  • Test and validation equipmentReserved
  • Analysis softwareReady
  • Receiving storageSufficient space secured
  • Project dataAwaiting arrival
The data must be ready by 7:00 AM.

Time is needed before work starts at 9:00 AM to check the files and the software environment.

Live contextNow

16:15Research center time

Overseas, tomorrow's work has already been prepared.

12 engineers will take part in the production feasibility review. Test equipment and the analysis environment are also ready. The data must arrive two hours before work begins.

Until work begins24 h 45 min

  • Data to deliver3.00 TB
  • Delivered0.00 TB
  • Remaining data3.00 TB
  • Current transfer statusPreparing transfer
Overseas engineering center
Engineers and equipment ready
Next task
Confirm data readiness deadline

PROJECT DATA3.00 TB

  • Product design640 GB
  • Simulation1.82 TB
  • Test and validation480 GB
  • Technical documents60 GB
Next story, Today 4:30 PMHow long will it take to deliver 3TB? →

THE AVAILABLE TIME

BEFORE TOMORROW'S WORK BEGINS

The file size is 3TB.
But the time available is limited.

The two sites are about 9,000km apart,
and the overseas engineering center is in a time zone 8 hours behind the research center.

3 TB
Total data
23 h
Until the data readiness deadline
2 h
Check time before work begins

INNORIX in PracticeScene 3 / 12

Transfer preparation16:30

Today 4:30 PMScene 3 / 12

How long will it take to deliver 3TB?

The company's existing network is in place between the research center and the overseas engineering center.

However, the network's maximum line speed does not translate directly into file transfer speed. The effects of network latency from the distance between the sites, packet loss, and network capacity used by other work must be taken into account. The person in charge checks the required transfer speed and the network environment actually available.

TRANSFER TIME ESTIMATIONArrival time depends on the available transfer speed

Data to deliver
3 TB
Available time, transfer starting 17:00
22 h
Average effective transfer speed

Estimated net transfer time8 h 20 min

Margin before the data readiness deadline13 h 40 min

If the selected average effective speed is maintained, the data can be delivered within the data readiness deadline.

This is the theoretical transfer time with 3TB calculated in decimal units. It does not include additional time for file scanning, preparation, verification, connection interruptions and the like.

Review for a long-distance transfer environment

Even for the same 3TB of data, the time required differs with the actual transfer environment.

Average effective transfer speedTime to transfer 3TB
100 Mbps66 h 40 min
200 Mbps33 h 20 min
400 Mbps16 h 40 min
800 Mbps8 h 20 min
1 Gbps6 h 40 min

Delivering 3TB within 22 hours requires an average effective transfer speed of at least about 303Mbps. In actual operation, a sufficient margin must be secured to allow for additional work and network fluctuations.

The company reviews the actual transfer conditions, including INNORIX Hyperlane, which can be used on long-distance networks.

Live contextNow

16:30Research center time

By when can 3TB of data be delivered?

The available network capacity at both sites and the time needed for the transfer are reviewed. 22 hours 30 minutes remain until the data arrival deadline.

Until work begins24 h 30 min

  • Data to deliver3.00 TB
  • Delivered0.00 TB
  • Remaining data3.00 TB
  • Current transfer statusReviewing transfer environment
Overseas engineering center
Preparing receiving storage
Next task
Set up files and transfer target

PROJECT DATA3.00 TB

  • Product design640 GB
  • Simulation1.82 TB
  • Test and validation480 GB
  • Technical documents60 GB
Next story, Today 4:45 PMThe scope of the data to deliver is confirmed. →

Today 4:45 PMScene 4 / 12

The scope of the data to deliver is confirmed.

Besides the final design data, the research center holds countless intermediate design files and temporary calculation results.

What the overseas engineering center needs is not the data from the entire development process, but the confirmed design version and the related materials needed to review it. The person in charge checks the final project folder and the transfer targets.

PROJECT DATA PREPARATIONProduct A / Rev.08

Project filesSize
Final_CAD_Models/640 GB
Simulation_Results/1.82 TB
Test_and_Validation/480 GB
Technical_Documents/60 GB
Previous_Design_Revisions/420 GB
Temporary_Calculations/760 GB
Local_Working_Files/120 GB

Selected project data 3.00 TB

SourceR&D Center/projects/Product_A/Rev08/
DestinationOverseas Engineering Center/engineering/Product_A/Rev08/

Live contextNow

16:45Research center time

The scope of the data to deliver is confirmed.

Besides the final design data, the research center holds countless intermediate design files and temporary calculation results. Only the confirmed design version and the related materials needed to review it are set as the transfer target.

Until work begins24 h 15 min

  • Data to deliver3.00 TB
  • Delivered0.00 TB
  • Remaining data3.00 TB
  • Current transfer statusConfirming transfer target
Overseas engineering center
Preparing receiving storage
Next task
Start the transfer to the overseas engineering center

PROJECT DATA3.00 TB

  • Product design640 GB
  • Simulation1.82 TB
  • Test and validation480 GB
  • Technical documents60 GB
Next story, Today 5:00 PMData delivery to the overseas engineering center begins. →

Today 5:00 PMScene 5 / 12

Data delivery to the overseas engineering center begins.

The research center's file server and the overseas engineering center's server are connected for the transfer.

The delivery target and the scope of the data have been confirmed, and space in the receiving storage has been checked. 3TB of project data begins to move directly between the two sites.

17:00TRANSFER STARTED

SourceR&D CenterEngineering File Server/projects/Product_A/Rev08/

3.00 TB

  • CAD models
  • Simulation results
  • Test and validation
  • Technical documents
DestinationOverseas EngineeringEngineering Storage Server/engineering/Product_A/Rev08/

8.40 TBStorage available before reception

This project's data, 3TB

RunsTransferring

Product_A_Rev08R&D Center / Overseas Engineering Center

Transferred
36 GB
Total size
3 TB
Current speed
940 Mbps

Example screen right after the transfer starts

Live contextNow

17:00Research center time

The transfer from the research center to the overseas engineering center begins.

The completed project data is selected, and a direct transfer begins to the designated storage at the overseas engineering center.

Until work begins24 h

  • Data to deliver3.00 TB
  • Delivered0.00 TB
  • Remaining data3.00 TB
  • Current transfer statusTransferring
Overseas engineering center
Data reception started
Next task
Check initial transfer performance
Next story, Today 6:00 PMThe results of the first hour of transfer are checked. →

Today 6:00 PMScene 6 / 12

The results of the first hour of transfer are checked.

One hour has passed since the transfer started.

The person in charge checks the size of the data actually delivered and the transfer speed. If the transfer continues at the current speed, the data is expected to arrive well before the time the overseas engineering center needs it.

FIRST HOUR OF TRANSFERActual transfer results are checked, not estimated times.

Delivered
420 GB
Average effective speed
933 Mbps
Transfer progress
14%
Mbps
02505007501000

Example of the change in effective transfer speed during the first hour

Total project data
3.00 TB
Remaining data
2.58 TB
Expected completion at current average speed
Around next day 00:09
Data readiness deadline
Next day 15:00

Live contextNow

18:00Research center time

Can it be delivered within the expected time?

The data actually delivered and the average speed during the first hour are checked. The expected completion time is reviewed based on the current transfer results.

Until work begins23 h

  • Data to deliver3.00 TB
  • Delivered0.42 TB
  • Remaining data2.58 TB
  • Current transfer statusTransferring
Overseas engineering center
Receiving project data
Next task
Running alongside existing work
Next story, Today 8:00 PMThe network is not used for this project alone. →

Today 8:00 PMScene 7 / 12

The network is not used for this project alone.

Many tasks are running at the same time at the research center and the overseas engineering center.

As routine server-to-server data transfers, business system use and nightly backups begin, the network capacity available for the project transfer changes as well. The transfer speed is lower than at the start, but data delivery continues.

SHARED ENTERPRISE NETWORKMany tasks running on one enterprise network

Hourly network usage, example of a 1Gbps lineProject data transferOther enterprise network use

Mbps
02505007501000
Delivered
1.15 TB
Remaining data
1.85 TB
Transfer progress
38.3%

Transfer performance varies with the company's actual network usage conditions. The network use of existing work is also taken into account when setting up transfer jobs.

Live contextNow

20:00Research center time

The two sites do not operate for this project alone.

Nightly backups and routine data transfer work begin. The available network bandwidth changes as well.

Until work begins21 h

  • Data to deliver3.00 TB
  • Delivered1.15 TB
  • Remaining data1.85 TB
  • Current transfer statusTransferring
Overseas engineering center
Reception in progress
Next task
Overnight transfer
Next story, Next day 1:10 AMAll project data has been delivered. →

THE NIGHT BETWEEN TWO WORKDAYS

23:00, R&D CENTER

The research center's day is over.
But the data for tomorrow's work is still moving.

Research center 23:00Today's R&D work finishedProject staff have gone home
Overseas engineering center 15:00Today's regular work in progressReceiving data for tomorrow's review

PROJECT DATA TRANSFERTransferring

2.08 TB / 3.00 TB69.3%

Transfer continues after the research center staff leave

Until work begins
18 h
Remaining data
0.92 TB
Overseas engineering center
Reception in progress
Next task
Deliver remaining data
Data keeps moving even after people have gone home.

The staff at the research center have left for the day. The transfer keeps running, and its progress is recorded.

INNORIX in PracticeScene 8 / 12

Data arrivalNext day 01:10

Next day 1:10 AMScene 8 / 12

All project data has been delivered.

8 hours 10 minutes have passed since the transfer started.

The 3TB of project data completed at the research center has been delivered to the designated storage at the overseas engineering center. There is still plenty of time before work begins at the overseas engineering center.

COMPLETE TRANSFER HISTORY01:10Completed

Delivered
3.00 TB
Remaining data
0.00 TB
0.0 TB0.5 TB1.0 TB1.5 TB2.0 TB2.5 TB3.0 TB
Transfer started
17:00
Transfer complete
01:10
Total duration
8 h 10 min

Live contextNow

Next day 01:10Research center time

All target files have arrived at the overseas engineering center.

The transfer is complete. Records remain so that the target files and transfer results can be checked.

Until work begins15 h 50 min

  • Data to deliver3.00 TB
  • Delivered3.00 TB
  • Remaining data0.00 TB
  • Current transfer statusCompleted
Overseas engineering center
Data reception complete
Next task
Overseas staff check the materials
Next storyThe arrival of 3TB of data is not the same as being able to start tomorrow's work. →

Scene 9 / 12

The arrival of 3TB of data is not the same as being able to start tomorrow's work.

The overseas engineering center must check not only that the data transfer is complete, but also that all the required materials are ready.

They check which design version of which project was delivered, and that there are no missing files or failed transfers.

Run detailsCompleted

Product_A_Rev08

Source
R&D Center
Destination
Overseas Engineering Center
Transferred
3.00 TB
Duration
08:10:00
Project data delivered
DatasetSizeResult
Final CAD models640 GBCompleted
Simulation results1.82 TBCompleted
Test and validation480 GBCompleted
Technical documents60 GBCompleted
Data delivery rate
100%
Final failed files
0
Remaining transfer data
0 B

Live contextNow

Next day 01:10Research center time

All target files have arrived at the overseas engineering center.

The transfer is complete. Records remain so that the target files and transfer results can be checked.

Until work begins15 h 50 min

  • Data to deliver3.00 TB
  • Delivered3.00 TB
  • Remaining data0.00 TB
  • Current transfer statusCompleted
Overseas engineering center
Data reception complete
Next task
Overseas staff check the materials
Next story, Overseas local time 6:00 AMThe data is checked before work begins. →

THE NEXT MORNING

OVERSEAS ENGINEERING CENTER, 06:00

Morning begins at the overseas engineering center.

The project data completed at the research center yesterday
has already arrived in the storage here.

PROJECT DATA AVAILABLEProduct_A / Rev08

  • Final_CAD_Models/640 GB
  • Simulation_Results/1.82 TB
  • Test_and_Validation/480 GB
  • Technical_Documents/60 GB

3.00 TBReceived

13 h 50 min
Arrived ahead of the data readiness deadline
3 h
Time now remaining until work begins

INNORIX in PracticeScene 10 / 12

Preparing to start workNext day 14:00

Overseas local time 6:00 AMScene 10 / 12

The data is checked before work begins.

The staff member at the overseas engineering center checks the project data needed for the review.

They confirm that the design version is the same as the project version used at the research center, and open the files in the applications needed for the work.

PREPARATION FOR PRODUCTION REVIEWProject data to be used today

Items checked by the overseas engineering center staff

  • Final design version Rev.08 confirmedChecked
  • Full composition of the project data confirmedChecked
  • Design files opened and reference files checkedChecked
  • Access to simulation results confirmedChecked
  • Test and technical documents checkedChecked
  • Production engineering review environment preparedChecked

Local time 07:00Ready for work

Live contextNow

Next day 14:00Research center time

Overseas staff check the data before work begins.

They check the received project data and approved version, the composition of the required files, and whether they can be used in the work applications.

Until work begins3 h

  • Data to deliver3.00 TB
  • Delivered3.00 TB
  • Remaining data0.00 TB
  • Current transfer statusCompleted
Overseas engineering center
Checking project materials
Next task
Prepare production engineering review

OVERSEAS ENGINEERING CENTER

Production review
  • Product design dataAvailable
  • Simulation resultsAvailable
  • Test and validation dataAvailable
  • Technical documentsAvailable
Checking materials before work begins
Next story, Overseas local time 9:00 AMThe scheduled work begins. →

Overseas local time 9:00 AMScene 11 / 12

The scheduled work begins.

12 engineers begin the production engineering review.

The design data completed at the research center is now used as material for new work at the overseas engineering center. The engineers analyze the product structure and production conditions, and compare the simulation results with the actual production environment.

PRODUCTION FEASIBILITY REVIEW09:00

Today's work

  1. 09:00Production engineering review meetingIn progress
  2. 10:30Design data analysisScheduled
  3. 13:00Simulation result validationScheduled
  4. 15:00Production feasibility reviewScheduled
  5. 17:00Review results summaryScheduled
Participating engineers
12
Project data
3 TB
Work schedule
Started on time

Live contextNow

Next day 17:00Research center time

12 engineers begin the scheduled work.

The design data completed at the research center the day before begins to be used in the overseas engineering center's work environment.

Until work beginsWork begins

  • Data to deliver3.00 TB
  • Delivered3.00 TB
  • Remaining data0.00 TB
  • Current transfer statusCompleted
Overseas engineering center
Production engineering review in progress
Next task
Produce review and test results

OVERSEAS ENGINEERING CENTER

Production review
  • Product design dataAvailable
  • Simulation resultsAvailable
  • Test and validation dataAvailable
  • Technical documentsAvailable
Production engineering review in progress
Next story, Overseas local time 5:00 PMThis time, new data has been created at the overseas site. →

Overseas local time 5:00 PMScene 12 / 12

This time, new data has been created at the overseas site.

The day's production engineering review is complete.

The overseas engineering center has produced review results based on production conditions, design change requests and additional simulation data. These materials will in turn be used for the next design work at the research center.

ENGINEERING REVIEW RESULTSProduct A, Production review results

  • Production feasibility review results4 GBProduction review reports
  • Design change review materials24 GBDesign modification requests
  • Additional analysis and validation data156 GBEngineering validation results

New data to deliver to the research center 184 GB

SourceOverseas Engineering Center
DestinationR&D Center

Data completed at one site starts the work at another site, and the new results produced there are used again for the next work.

Live contextNow

Day after next 01:00Research center time

New data has been created at the overseas site.

The day's production engineering review is complete. The review results, design change requests and additional simulation data will in turn be used for the next design work at the research center.

Until work beginsWork begins

  • Data to deliver3.00 TB
  • Delivered3.00 TB
  • Remaining data0.00 TB
  • Current transfer statusCompleted
Overseas engineering center
Production engineering review complete
Next task
Next design work at the research center

OVERSEAS ENGINEERING CENTER

Production review
  • Product design dataAvailable
  • Simulation resultsAvailable
  • Test and validation dataAvailable
  • Technical documentsAvailable
Production engineering review complete

FROM DESIGN TO PRODUCTION

The design completed at the research center yesterday
started new work overseas today.

YESTERDAY, 16:00Research center

Design work complete
The result of 6 weeks of R&D work

TODAY, 09:00, LOCAL TIMEOverseas engineering center

Production engineering review begins
New work starting from the same project data

3 TB
Project data delivered
9,000km
Distance between sites
On schedule
Start of the next work

In a company, data is not simply a file to be delivered.
It is the result of work someone has completed,
and the foundation of work someone else must begin.

Files need to arrive
because there is work to be done there.
INNORIX

THE TECHNOLOGY BEHIND THIS STORY

Inter-Site Transfer

INNORIX, which delivers large volumes of business data between a company's research centers, production facilities, headquarters and overseas sites, and builds an environment for continuous collaboration.

View product details