INNORIX in Practice, Inter-Site Transfer

Sites may be distributed,
but work is not divided.

Work that starts in different places, organizations that need each other's results.

Follow the story of a company operating sites in several regions, from one Monday to 2 years later.

Scenario
This story uses a fictional company environment to look at how data moves between sites and how work actually runs.

07:00MONDAY, HEADQUARTERS TIME

The headquarters day
begins with an overseas branch's work.

Before headquarters staff arrive at work, work data completed by the North America branch is arriving.

  • Headquarters07:00Before workReceiving work data
  • Research Center07:00Before workPreparing design data
  • Production Facility06:00Preparing productionWaiting for production data
  • North America Branch17:00Sunday, closing workDelivering work results
  1. 07:00The start of work
  2. 11:40The unexpected
  3. 18:00Handing over work
  4. 2 years later

INNORIX in PracticeScene 1 / 11

Company backgroundWork done in different places

Company backgroundWork done in different placesScene 1 / 11

A company's work does not happen in one place.

This company has long run its business centered on its headquarters and research center.

As the business grew, it built a production facility in Southeast Asia and established a branch in North America to serve local customers.

Design data created at the research center is used at the production facility, and validation data generated at the production facility is used by the research center and headquarters. The North America branch delivers local customers' requirements and work results to the organization in Korea.

The company introduced INNORIX to connect the servers at its different sites and exchange the data it needs directly.

Each site does different work, but each needs the others' results.

Company backgroundWork done in different places

The company's work environment

SiteRegionWorkData produced
HeadquartersKoreaBusiness operations and work managementBusiness data, customer support data, past work records
Research CenterKoreaProduct research and designDesign files, technical documents, validation data
Production FacilitySoutheast AsiaProduct manufacturing and testingProduction data, test results, quality validation data
North America BranchNorth AmericaLocal customer and business operationsCustomer technical data, local validation results, work reports

The data created at each site is also used in the work of other sites.

Live contextNow

Company backgroundCompany operating environment

  • Headquarters

    KoreaManagement and business operations

  • Research Center

    KoreaResearch and design

  • Production Facility A

    Southeast AsiaProduct manufacturing and validation

  • North America Branch

    North AmericaLocal customer work

Current work

Building a data operation environment between sites

Next workMonday, work starts at each site

Next story, 07:00Data that arrives before work →

One Monday07:00Scene 2 / 11

The headquarters day begins with an overseas branch's work.

Monday, 7:00 a.m. No staff have arrived yet at headquarters or the research center.

The North America branch is wrapping up the customer validation work it carried out over the weekend and delivering the results to headquarters and the research center.

North America Branch, work finishedCustomer validation resultsCustomer validation data and technical review results

HeadquartersReceived

Research CenterReceived

At 9:00 a.m., staff in Korea arrive at work and check the customer validation data that has already arrived. The research center starts its design review based on those results.

As another site's work ends, today's work begins.

Monday morningA day that starts with another site's work

North America Branch, Sunday17:00

Weekend customer validation work finished

Customer validation

Validation report.pdfReadyTest results.zipReadyCustomer requirements.xlsxReady
Delivering work results to headquarters and research center
Headquarters, Monday09:00

Today's work begins

Received from North America

Validation report.pdfReceivedTest results.zipReceivedCustomer requirements.xlsxReceived
Starting review based on the work results that arrived

When headquarters staff arrived at work,the data they needed today had already arrived.

Live contextNow

07:00Headquarters time

  • Headquarters

    KoreaReceiving work results

  • Research Center

    KoreaReceiving validation data

  • Production Facility A

    Southeast AsiaPreparing production

  • North America Branch

    North AmericaClosing weekend work

Current work

Delivering North America customer validation data

Next work09:00, research center design review

Next story, 09:30From the research center to the production facility →

One Monday09:30Scene 3 / 11

The research center's design becomes the production facility's work.

The research center did a final check of the new product design data prepared last week.

The production facility is waiting for the design files and the technical data needed for this afternoon's trial production.

Data transfer begins from the research center's server to the production facility's server. The person in charge does not need to upload the data to the headquarters server again or go through a separate external storage environment.

Research Center, final design dataProduction design package

Destination, Production Facility ATransferring

Once the transfer is complete, the production facility will use the data to prepare trial production.

Work completed at the research center leads into the production facility's next work.

9:30 a.m.From the research center to the production facility

Trial production scheduled this afternoon, 14:00

The production facility is waiting for the research center's final design data.

Research CenterFinal design data ready

Design model186 GB

Engineering drawings24 GB

Simulation results210 GB

Total data420 GB

Production FacilityReceiving data for trial production

Design model

Engineering drawings

Simulation results

Trial production preparation after receipt

Data is transferred directly from the research center's server to the production facility's server.

Live contextNow

09:30Headquarters time

  • Headquarters

    KoreaBusiness work in progress

  • Research Center

    KoreaDelivering design data

  • Production Facility A

    Southeast AsiaReceiving production data

  • North America Branch

    North AmericaWork finished

Current work

Delivering technical data for trial production

Next work14:00, trial production preparation

Next story, 11:00An unplanned work request →

One Monday11:00Scene 4 / 11

The production facility requested additional data.

A production staff member reviewing the design data requests the test results of a previous product and additional technical documents.

The test results are kept at headquarters, and the technical documents at the research center.

Production Facility11:02

Please send the previous product test results and additional technical documents.

Headquarters11:05

We will send the test results.

Research Center11:07

We have started sending the additional technical documents.

Each of the two sites selects the data needed and sends it to the production facility.

The new work request is handled separately from the design data transfer already in progress.

Which site the data is kept at does not limit collaboration.

11:00 a.m.An unplanned data request

Production Facility, Production Engineering Team11:02

We need additional data as we prepare for this afternoon's trial production.

Please send the previous product's test results and technical review documents.

Planned use, 14:00 headquarters time
Headquarters11:05

We will send the test results from last quarter.

Research Center11:07

We have started sending the additional technical documents.

11:00 a.m.An unplanned data request

Data being received at the production facility

DataSource siteStatus
New product design dataResearch CenterTransferring
Previous product test resultsHeadquartersTransferring
Additional technical documentsResearch CenterTransferring

Live contextNow

11:00Headquarters time

  • Headquarters

    KoreaDelivering past test results

  • Research Center

    KoreaDelivering more technical documents

  • Production Facility A

    Southeast AsiaReceiving additional data

  • North America Branch

    North AmericaWork finished

Current work

Additional data from headquarters and research center

Next work14:00, trial production preparation

Next story, 11:40Connection failure at the production facility →

One Monday11:40Scene 5 / 11

The production facility is waiting for data.

The production facility's network connection was temporarily lost. The design data and additional data transfers in progress stop.

Files already delivered are kept. Interrupted transfers wait until the connection is restored. Independent transfers between headquarters and the research center continue.

  1. 11:40
  2. 11:52
  3. 12:46
Design dataWaiting for recovery
Past test resultsWaiting for recovery
Additional technical documentsWaiting for recovery

Work between headquarters and research centerRunning normally

At 11:52, the production facility's network connection is restored. The interrupted transfers continue.

At 12:46 p.m., all the data needed for trial production has arrived. The production facility prepares its afternoon work as scheduled.

Something unexpected happened, but the scheduled work timeline was kept.

11:40 a.m.The production facility's network connection was lost.

11:40Trial production preparation scheduled, 14:00

The production facility's network connection was interrupted.

Production FacilityDisconnected

New product design dataWaiting for recovery

Previous product test resultsWaiting for recovery

Additional technical documentsWaiting for recovery

Work at other sites

Headquarters, Research CenterDelivering design review dataRunning normally
Headquarters, North America BranchDelivering regular work dataRunning normally
  1. 11:40 Stopped
  2. 11:52 Recovered
  3. 12:46 Completed
  4. 14:00 Work

Transfers to the production facility wait for the connection to recover. Independent transfers between other sites continue.

Files already delivered are kept, and the interrupted transfers continue.

The production facility secured the data it needed before starting its scheduled work.

A temporary connection problem occurred, but trial production preparation started as scheduled.

Live contextNow

11:40Headquarters time

  • Headquarters

    KoreaIndependent work continues

  • Research Center

    KoreaWaiting for transfer recovery

  • Production Facility A

    Southeast AsiaNetwork disconnected

  • North America Branch

    North AmericaWork finished

Current work

Transfers to the production facility paused

Next work14:00, trial production preparation

Next story, 15:30Production results go to the research center →

One Monday15:30Scene 6 / 11

This time, the research center is waiting for data.

The production facility finishes trial production and prepares validation data.

The research center needs to check the test results from the actual production process before it can finish its design review.

Validation data is delivered from the production facility's server to the research center. The site that received data in the morning has become the site delivering data in the afternoon.

Production Facility A
Production test resultsProduction records, test results, validation data

Research CenterDelivered

The person in charge at the research center carries on with follow-up work based on the validation data that arrived.

A company's data does not move in only one direction.

3:30 p.m.This time, the research center is waiting for data.

Afternoon trial production complete

The site that was receiving data has become the site delivering data.

Production FacilityGenerating test and validation data

  • Production logs
  • Measurement data
  • Validation results

Delivering results to the research center

Research CenterReceiving and reviewing test results

  • Checking production recordsUsed as validation data
  • Analyzing measurement dataUsed as validation data
  • Reviewing design suitabilityUsed as validation data

Proceeding with follow-up work

From the research center to the production facility in the morning, from the production facility to the research center in the afternoon. The direction data moves also changes with the company's work.

Live contextNow

15:30Headquarters time

  • Headquarters

    KoreaChecking work results

  • Research Center

    KoreaReceiving validation data

  • Production Facility A

    Southeast AsiaDelivering test results

  • North America Branch

    North AmericaBefore work

Current work

Delivering production results to the research center

Next work17:00, validation results finalized

Next story, 18:00Work that continues in another time zone →

One Monday18:00Scene 7 / 11

When headquarters' work ends, the North America branch's day begins.

Staff in Korea are wrapping up today's work.

Technical data reviewed by the research center and customer support data prepared by headquarters begin to be delivered to the North America branch.

8:00 a.m. local time. North America branch staff arrive at work and check the data prepared by the organization in Korea.

Headquarters18:00Work finished
North America Branch04:00Preparing data before work

Even after staff in Korea have left for the day, the North America branch carries on customer work using the data it received.

The end of one site's day is not the end of the company's day.

6:00 p.m.One site's work ends, another site's work begins

6:00 p.m.One site's work ends, another site's work begins

Headquarters, Monday18:00

Today's work finished

Delivering customer support data and technical review results.
North America Branch, Monday04:00

Preparing today's work

Data to be used after staff arrive at work is arriving.
4 hours later08:00

North America Branch staff arrive

Work data ready

The headquarters day is over,but the company's day continues.

Live contextNow

18:00Headquarters time

  • Headquarters

    KoreaClosing work

  • Research Center

    KoreaDelivering final data

  • Production Facility A

    Southeast AsiaProduction work in progress

  • North America Branch

    North AmericaCustomer work begins

Current work

Delivering work data to the North America branch

Next workNorth America 09:00, customer work

Next story, 6 months laterA new production facility →

SIX MONTHS LATER

And 6 months have passed.

As production demand grew, the company decided to operate a new production facility.

  • HeadquartersExisting site
  • Research CenterExisting site
  • Production Facility AExisting site
  • North America BranchExisting site
  • Production Facility BNew site

Work at the existing sites continues.

INNORIX in PracticeScene 1 / 11

Company backgroundWork done in different places

How the company changed6 months laterScene 8 / 11

The company has begun operating a second production facility.

As production demand grows, the company builds a second production facility in a new region.

The new facility uses a different network environment and server configuration from the existing production facility.

The operations manager connects the new facility's server and adds transfer jobs that exchange data with the research center and headquarters.

Research Center, technical data recipients

Production Facility AExisting facilityIn operation

Production Facility BNew facilityWork added

Work at the existing production facility continues. The research center prepares and delivers the technical data each production facility needs.

A production facility was added, but the existing data operation system was not replaced.

6 months laterA new production facility

The company's business expansion

The new production facility uses a different environment from the existing facility.

Production Facility AExisting production facility

Server environment
Windows Server
Network
Dedicated corporate line
Work in operation
Receiving design data, delivering production validation data

Existing work running normally

Production Facility BNew production facility

Server environment
Red Hat Enterprise Linux
Network
Internet VPN
Work being added
Receiving design data, delivering production validation data

New transfer work ready

6 months laterA new production facility

The research center's data delivery work

WorkDestination siteStatus
Existing product design dataProduction Facility AIn operation
New product design dataProduction Facility BAdded

A new site was added,but the existing data operation system was not rebuilt.

Live contextNow

6 months laterCompany operating environment

  • Headquarters

    KoreaSupporting new facility operations

  • Research Center

    KoreaTechnical data for two facilities

  • Production Facility A

    Southeast AsiaExisting production in progress

  • North America Branch

    North AmericaLocal work operations

  • Production Facility B

    Southeast AsiaConnecting new server

Current work

Adding data work for the new production facility

Next workSecond production facility starts operating

Next story, 1 year laterA new global project →

How the company changed1 year laterScene 9 / 11

Now research work also takes place in several regions.

The company establishes a new research site in Europe. The research center in Korea and the European research site carry out one project together.

As the project progresses, the volume of design and validation data moving between the sites grows.

Joint research projectHigh-resolution design datasets

Research Center in Korea / European Research SiteTransferring

Taking the long-distance transfer environment and network conditions into account, the company improves transfer performance and sets up scheduled transfers that match each site's work schedule.

The European research site picks up the work results of the research center in Korea, reviews them, and sends follow-up results back.

More regions take part in the research, but they carry out one project.

1 year laterGlobal joint research project

A new European research site

One project is carried out in different regions.

Research Center in Korea18:00

Wrapping up design work

Today's completed design and simulation data is delivered to the European research site.
European Research Site10:00

Preparing follow-up review work

It receives data from the research center in Korea and carries out technical review and validation work.

1 year laterGlobal joint research project

The infrastructure operations team's review

ItemDetails
Physical distance between sitesLong-distance network
Data sizeContinuous growth
Transfer performanceConsidering long-distance acceleration
Run scheduleBased on research work end time

Even as data grows larger and distances grow longer,the project must keep moving forward.

Live contextNow

1 year laterCompany operating environment

  • Headquarters

    KoreaProject management

  • Research Center

    KoreaDelivering design results

  • Production Facility A

    Southeast AsiaTrial production

  • North America Branch

    North AmericaCustomer validation

  • Production Facility B

    Southeast AsiaPreparing production data

  • European Research Site

    EuropeStarting design review

Current work

Delivering research data between Korea and Europe

Next workGlobal joint project in progress

Next story, 2 years laterThe company's changed operating environment →

How the company changed2 years laterScene 10 / 11

The company's sites and work have nearly doubled.

Over the past 2 years, a new production facility and a research site have been added.

The operations manager checks the transfer jobs running at each site and their past run history. They check when a specific piece of data was delivered to which site, or find failed transfers and review the results.

When a new project or site is added, the required transfer jobs are added to the existing operating environment.

Each organization still works in its own work environment.

The company's reach has grown wider, but data operations run in a single system.

2 years laterThe company's reach has grown wider.

Corporate infrastructure operations team, Monday morning

Today, too, data is moving between many sites.

Main transfer jobs currently in operation

JobSource siteDestination siteSchedule
Customer validation resultsNorth America BranchHeadquartersDaily
Design data deliveryResearch CenterProduction Facility ADaily
Design data deliveryResearch CenterProduction Facility BDaily
Production validation resultsProduction Facility AResearch CenterDaily
Production validation resultsProduction Facility BResearch CenterDaily
Joint research dataResearch CenterEuropean SiteDaily
Research review resultsEuropean SiteResearch CenterDaily
Customer technical dataHeadquartersNorth America BranchAs needed

2 years laterThe company's reach has grown wider.

Production Facility B, Quality Control Team

Can we check the transfer record of the final design data the research center sent last week?

Searchdesign_final_rev08.zip

SourceDestinationCompleted
R&D CenterProduction BNov 12 10:42
R&D CenterProduction ANov 12 09:36

2 years laterThe company's reach has grown wider.

Headquarters, Infrastructure Operations Team

There is a record of delivery to Production Facility B completed last Thursday at 10:42 a.m.

Sites have increased and transfer jobs have grown,but the company manages them in a single data operation system.

Live contextNow

2 years laterCompany operating environment

  • Headquarters

    KoreaManaging all operations

  • Research Center

    KoreaDesign work in progress

  • Production Facility A

    Southeast AsiaProduction work in progress

  • North America Branch

    North AmericaLocal customer work

  • Production Facility B

    Southeast AsiaProduction work in progress

  • European Research Site

    EuropeJoint research in progress

Current work

Transfer operations between all sites

Next workNew company work

Next story, TodayMoving as one company →

The company todayTodayScene 11 / 11

They still work in different places.

Headquarters and the research center, the production facilities and the overseas branch are physically apart.

Each site's network environment, working hours and servers are all different.

But work completed at one site becomes the data for another site's next work.

And all this time, INNORIX has been delivering the data needed to the sites that need it.

Sites may be distributed, but work is not divided.

Live contextNow

TodayCompany operating environment

  • Headquarters

    KoreaOperating normally

  • Research Center

    KoreaOperating normally

  • Production Facility A

    Southeast AsiaOperating normally

  • North America Branch

    North AmericaOperating normally

  • Production Facility B

    Southeast AsiaOperating normally

  • European Research Site

    EuropeOperating normally

Current work

Data operations between sites

Next workNew work ahead

TODAY

This company still
works in different places.

Over the past 2 years, a new production facility was added and a new research site was established in Europe.

The kinds of work done in different regions and the volume of data that moves have also changed.

The start of the story
  • HeadquartersBusiness operations
  • Research CenterProduct research
  • Production Facility AProduct manufacturing
  • North America BranchLocal customer work
The company 2 years later
  • HeadquartersBusiness operations
  • Research CenterProduct research
  • Production Facility AProduct manufacturing
  • North America BranchLocal customer work
  • Production Facility BExpanded production
  • European Research SiteJoint research

Not every organization needed to work in one place.

Not every site needed to use the same server and network environment.

Nor did they need to start work at the same time.

Sites may be distributed,
but work is not divided.
INNORIX

THE TECHNOLOGY BEHIND THIS STORY

Inter-Site Transfer

INNORIX for moving data between a company's headquarters, branches, research centers and production facilities located in different regions.

View product details