INNORIX in Practice, Inter-Site Transfer

From next month, the work done here
will be performed at another site.

Work at the existing site continues until the end of this month.
The new site must perform the same work from the first working day of next month.

Business data to be transferred
86 TB
Projects that must continue
38
Until the new site starts operating
30 days

CURRENT TECHNICAL CENTER

Existing technical support centerOperating until the last working day of this month
  • Projects in progress38
  • Accumulated business data86 TB
  • Years of operation8 years
  • Current workProceeding normally

NEW TECHNICAL CENTER

New technical support centerOperating from the first working day of next month
  • Work spacePrepared
  • Test and analysis equipmentInstalled
  • Servers and storagePrepared
  • Existing business dataPreparing for transfer

The site changes, but the work carried out over the past 8 years does not start over from the beginning.

INNORIX in PracticeScene 1 / 13

Preparing the relocation30 days before

30 days before the relocationScene 1 / 13

Reviewing the work done here over the past 8 years.

The existing technical support center has handled the company's product testing and technical analysis for the past 8 years.

A wide range of data has accumulated, from test records of products no longer in production to validation materials for products currently in development.

Some data is used every day, but some materials are needed only once every few years to investigate problems with past products.

This work must be able to continue at the new site as well.

EIGHT YEARS OF ENGINEERING WORK

Data accumulated at the existing technical support center

Data generated and retained by year

Business data
86 TB
Total files
2.4 million
Projects in progress
38

Data by type of work

  • Completed projects58 TBPast product tests, quality validation and technical analysis records
  • Projects in progress18 TBWork materials for products currently being tested and analyzed
  • Shared work materials10 TBStandard test procedures, technical documents, reference data

Live contextNow

30 days beforePreparing the relocation

What needs to move is not only the files stored on the servers.

The full makeup of completed projects, work in progress, test data, analysis results and shared technical materials is reviewed.

  • Total transfer scope86.00 TB
  • Data transferred0.00 TB
  • Remaining data86.00 TB
Existing center
Normal operation
New center
Preparing environment
Next task
Classifying business data

EXISTING BUSINESS DATA86 TB

  • Completed projects58 TB
  • Projects in progress18 TB
  • Shared work materials10 TB
Next story, 28 days before the relocationThe work environment at the new site is ready. →

28 days before the relocationScene 2 / 13

The work environment at the new site is ready.

The new site has a larger work space and more test equipment than the existing site.

The servers and storage have also been newly set up.

Rather than moving the existing site's equipment as it is, the plan is to perform the same work as before on the new infrastructure.

PREPARING THE NEW WORKPLACE

Existing technical support centerCurrent infrastructureWindows ServerExisting file servers and NAS120 TB86TB in use
New technical support centerNew infrastructureRed Hat Enterprise LinuxNew file storage for work240 TBReady to receive the data to be transferred

Readiness of the new site

  • Servers and storagePrepared
  • Network between sitesConnected
  • Test and analysis equipmentInstalled
  • Work applicationsInstalled
  • Existing business dataScheduled for transfer

Live contextNow

28 days beforePreparing the relocation

The infrastructure at the new site is ready.

The transfer environment is prepared so that the same work can be performed on server and storage environments that differ from those at the existing site.

  • Total transfer scope86.00 TB
  • Data transferred0.00 TB
  • Remaining data86.00 TB
Existing center
Normal operation
New center
Infrastructure ready
Next task
Setting transfer targets

EXISTING BUSINESS DATA86 TB

  • Completed projects58 TB
  • Projects in progress18 TB
  • Shared work materials10 TB
Next story, 25 days before the relocationCompleted projects are transferred first. →

TWO WORKPLACES, ONE TRANSITION

THE NEXT 30 DAYS

The existing site operates until it closes its doors.
The new site must be ready before then.

The company cannot stop work to transfer all of its data.
A data transfer plan is drawn up around the operating schedules of the two sites.

  • Existing siteOperating until the last day
  • Data transferIn parallel with existing work
  • New siteOperating from the first working day

INNORIX in PracticeScene 3 / 13

Data transfer25 days before

25 days before the relocationScene 3 / 13

Completed projects are transferred first.

The data of projects completed over the past few years is mostly final.

In contrast, the materials of projects currently in progress change or are newly created every day.

The person in charge decides the transfer order based on the business characteristics of the data.

DATA TRANSFER PLAN

Not all business data needs to be transferred at the same time.

  • Completed projectsArchived projectsPast work materials whose content is final are transferred first.58 TBTransfer scheduleFrom 25 days before
  • Shared work materialsShared technical resourcesMaterials used to validate the work environment at the new site are prepared.10 TBTransfer scheduleIn parallel with the transfer of existing projects
  • Projects in progressActive projectsCurrent materials are transferred first, and materials added or changed afterwards are reflected separately.18 TBTransfer scheduleAdditional transfers after the initial transfer, until the last working day

Studio, Flows

Flow nameSizeStatus
Archived projects58 TBRunning
Technical resources10 TBScheduled
Active projects18 TBScheduled
Additional project filesVariableReady

Live contextNow

25 days beforeData transfer

Completed projects are transferred first.

To avoid affecting current work, past projects and test records that are unlikely to change are transferred to the new site first.

  • Total transfer scope86.00 TB
  • Data transferred0.00 TB
  • Remaining data86.00 TB
Existing center
Normal operation
New center
Started receiving data
Next task
Transferring past business data

INITIAL DATA TRANSFER0 TB

020406080

D-25D-10

Based on the initial 86TB scope
Next story, 18 days before the relocationNew data is generated even while data is being transferred. →

18 days before the relocationScene 4 / 13

New data is generated even while data is being transferred.

A week has passed since the data transfer started.

Files from the existing site are being delivered to the new site, but testing and analysis work also continues at the existing site.

The size of the data newly generated over the past week is 800GB.

The total transfer scope checked a week ago and the range of data that must be transferred now are no longer the same.

BUSINESS CONTINUES DURING TRANSFER

Shrinking transfer targets and continuously growing business data

Initial transfer scope
86 TB
Newly generated data
800 GB
Transfer complete
35 TB
CURRENT TECHNICAL CENTERWork still in progress today
  • Product durability tests
  • Component quality validation
  • Test result analysis
NEW TECHNICAL CENTERRECEIVED DATA35 TBBusiness data transfer in progress
  • Receiving past projects
  • Shared work materials to be received
  • Preparing the new work environment

Live contextNow

18 days beforeData transfer

Work continues while the data is being transferred.

New test results and analysis materials are being generated at the existing site. Data transfer to the new site runs in parallel.

  • Total transfer scope86.80 TB
  • Data transferred35.00 TB
  • Remaining data51.80 TB
Existing center
38 projects in progress
New center
Receiving data
Next task
Transferring active projects

INITIAL DATA TRANSFER35 TB

020406080

D-25D-10

Based on the initial 86TB scope
Next story, 14 days before the relocationThere are materials the new site needs first. →

14 days before the relocationScene 5 / 13

There are materials the new site needs first.

At the new technical support center, the test equipment has been installed and the work applications are being validated.

However, the installation of equipment alone is not enough to confirm that existing work can be performed normally.

Materials on products tested in the past, standard test procedures and actual measurement data are needed.

The person in charge transfers the materials needed for validation separately before the full data transfer is finished.

EARLY ACCESS FOR WORKPLACE VALIDATION

Not all the data has arrived yet, but some work can already be prepared.

Request to validate the test environment at the new site

The materials below are needed for the test equipment validation starting next week.

  • Standard_Test_Procedures/12 GB
  • Reference_Test_Data/180 GB
  • Equipment_Configuration/8 GB
  • Sample_Engineering_Projects/120 GB

Data requested for priority transfer320 GB

RunsCurrent transfers

  • Historical project transferRunning
  • Workplace validation files320GB transfer completeCompleted

The new site starts validating the work environment using the materials it has received. The transfer of the existing data also continues.

Live contextNow

14 days beforeData transfer

There are materials the new site needs first.

The new technical support center receives the materials needed for test equipment validation separately, before the full data transfer is complete. The transfer of existing data continues.

  • Total transfer scope86.80 TB
  • Data transferred60.50 TB
  • Remaining data26.30 TB
Existing center
38 projects in progress
New center
Receiving validation materials first
Next task
Complete the existing data transfer

INITIAL DATA TRANSFER60 TB

020406080

D-25D-10

Based on the initial 86TB scope
Next story, 10 days before the relocationThe transfer of the originally planned data is complete. →

10 days before the relocationScene 6 / 13

The transfer of the originally planned data is complete.

The 86TB of data identified at the start of the relocation has been delivered to the new site.

However, work at the existing site continues for ten more days.

Some of the files already delivered have changed again, and new files have also been created.

Completing the full data transfer does not mean the relocation is complete.

INITIAL TRANSFER COMPLETED

Work that remains even after the initial data transfer

Initial transfer scope86 TBTransfer complete
Data added since the transfer started1.9 TBNew materials not included in the initial transfer scopeAdditional transfer

Work materials that need to be transferred additionally

ProjectChangesSize
Product ANew test results480 GB
Product BAdditional analysis data620 GB
Product CQuality validation data340 GB
Shared work materialsNew technical materials160 GB
Other projectsNew business data300 GB

Total size of new materials1.90 TB

Live contextNow

10 days beforeData transfer

The transfer of the originally planned 86TB of data is complete.

The transfer of the files in the initial scope is complete. Materials created or changed at the existing site after that are checked and transferred separately.

  • Total transfer scope87.90 TB
  • Data transferred86.00 TB
  • Remaining data1.90 TB
Existing center
Normal operation
New center
Existing data secured
Next task
Transferring added and changed materials

INITIAL DATA TRANSFER86 TB

020406080

D-25D-10

Based on the initial 86TB scope
Next story, 7 days before the relocationExisting projects are opened at the new site. →

THE NEW WORKPLACE IS ALMOST READY

7 DAYS BEFORE THE TRANSITION

Data having arrived
is not the same as being able to start work.

DATA TRANSFER87.8 TBWork materials delivered to the new site
WORKPLACE VALIDATIONWork environment validationWork tests using actual projects

While the existing site is still operating, it is checked whether the same work can be performed at the new site.

INNORIX in PracticeScene 7 / 13

Work environment validation7 days before

7 days before the relocationScene 7 / 13

Existing projects are opened at the new site.

Staff deployed to the new site first begin using the data of existing projects.

They load past measurement results in the product test program and open projects created at the previous site in the analysis program.

They check not only whether the files were transferred correctly but also whether the same work as before can be performed.

BUSINESS ENVIRONMENT VALIDATION

The first work test performed at the new site

Validation results by task

  • Looking up test records of past productsAccess to existing test results and analysis reportsVerified
  • Opening projects in progressChecking current projects and related reference filesVerified
  • Running test and analysis programsChecking that the programs work with actual business dataVerified
  • Looking up shared technical materials by productChecking standard test procedures and technical documentsVerified
  • Reflecting newly generated materialsChecking recent work results from the existing siteIn progress
Staff who took part in validation
8
Projects validated
38

Live contextNow

7 days beforeWork environment validation

Existing projects are opened at the new site.

Staff use the actual work applications to check whether the transferred projects, reference files and test records can be used.

  • Total transfer scope88.20 TB
  • Data transferred87.80 TB
  • Remaining data0.40 TB
Existing center
Normal operation
New center
Work environment validation
Next task
Final check of files and work materials

WORK ENVIRONMENT VERIFICATION

  • Access to existing projectsVerified
  • Shared technical materialsVerified
  • Test results and reference filesValidating
  • Recently changed filesAdditional transfer

0.400 TBData that currently needs to be transferred

Next story, 3 days before the relocationChecking whether all the necessary files have been transferred. →

3 days before the relocationScene 8 / 13

Checking whether all the necessary files have been transferred.

During validation of the work environment at the new site, it was found that some reference materials are still at the existing site.

The file transfer records are searched to see which materials have already been delivered and which are still needed.

Test records from several years ago can be used again in projects currently in progress.

TRANSFER RECORDS AND DATA VERIFICATION

Checking whether the necessary materials have been transferred.

Search

Product_A / Reference_Test_2021Search

Destination: New Technical Center
FileTransfer result
Test_Report_2021.pdfCompleted
Measurement_2021.datCompleted
Reference_Model.stepCompleted
File additionally requested by staffCalibration_Reference_2021.datNo transfer record matches the current search criteria

Transfer targets additionally found in the final check

  • Reference materials from past tests18 GB
  • Recently generated test results126 GB
  • Additional project materials56 GB

Additional transfer targets200 GB

Live contextNow

3 days beforeWork environment validation

Some materials are still at the existing site.

The final transfer scope is compared with the receipt records, and missing or recently changed files are selected and transferred additionally.

  • Total transfer scope88.70 TB
  • Data transferred88.50 TB
  • Remaining data0.20 TB
Existing center
Normal operation
New center
Final data check
Next task
Preparing the last changed materials

WORK ENVIRONMENT VERIFICATION

  • Access to existing projectsVerified
  • Shared technical materialsVerified
  • Test results and reference filesVerified
  • Recently changed filesAdditional transfer

0.200 TBData that currently needs to be transferred

Next story, Last working day at the existing siteToday's work is still done here. →

Last working day at the existing siteScene 9 / 13

Today's work is still done here.

At 9 a.m., the last working day at the existing technical support center began.

Employees carry out testing and analysis work as usual.

Some projects will not be completed today. Those projects will continue at the new site from the next working day.

THE FINAL WORKING DAY

The last work schedule at the existing technical support center

  1. Regular work beginsTesting and analysis of existing projects
  2. Product durability testValidation of products in progress
  3. Test result analysisReviewing data generated today
  4. Recording project progressOrganizing work to continue on the next working day
  5. Saving the last work materialsFinalizing test results and analysis materials
  6. Work at the existing site endsNo further changes to work files
  7. Transferring the final changed materialsLast data transfer to the new site

Current project progress

Product A, Durability test16 / 24

Product B, Quality validation28 / 40

Product C, Technical analysis7 / 12

Work in progress continues at the new site exactly as it is, unfinished.

Live contextNow

Last working dayWork transition

At 6 p.m., work at the existing site ends.

After the last test and analysis results are saved, changes to work files at the existing site are stopped. The final 42GB of changed data is transferred.

  • Total transfer scope89.00 TB
  • Data transferred88.96 TB
  • Remaining data42 GB
Existing center
Work ended
New center
Receiving final data
Next task
Final check and approval

WORK ENVIRONMENT VERIFICATION

  • Access to existing projectsVerified
  • Shared technical materialsVerified
  • Test results and reference filesVerified
  • Recently changed filesFinal transfer in progress

0.042 TBData that currently needs to be transferred

Next story, Last working day, 18:10The last work results are transferred. →

THE LAST 42 GB

18:00, THE FINAL WORKING DAY

The transfer of data accumulated over the past 8 years
now has only the last 42GB remaining.

Existing technical support centerLast work completedChanges to business data stopped
New technical support centerWaiting to receive the final work materialsPreparing to start work at the new site
Total data to be transferred
89 TB
Last transfer target
42 GB
The initial 86TB transfer scope and 3TB of work materials newly generated afterwards

INNORIX in PracticeScene 10 / 13

Work transitionLast working day

Last working day, 18:10Scene 10 / 13

The last work results are transferred.

All staff at the existing site have saved today's results.

With further changes to work files stopped, the administrator checks the final transfer targets.

The last test results, analysis materials and project progress records are delivered to the new site.

FINAL DATA TRANSFER

Final_workday_filesCompleted

Source
Current Technical Center
Destination
New Technical Center

42 GB / 42 GB

  • Final endurance test results18 GBCompleted
  • Quality measurement data12 GBCompleted
  • Engineering analysis results9 GBCompleted
  • Project handover documents3 GBCompleted
Transfer started
18:10
Transfer complete
18:24
Remaining data
0 GB

Live contextNow

Last working dayWork transition

At 6 p.m., work at the existing site ends.

After the last test and analysis results are saved, changes to work files at the existing site are stopped. The final 42GB of changed data is transferred.

  • Total transfer scope89.00 TB
  • Data transferred88.96 TB
  • Remaining data42 GB
Existing center
Work ended
New center
Receiving final data
Next task
Final check and approval

WORK ENVIRONMENT VERIFICATION

  • Access to existing projectsVerified
  • Shared technical materialsVerified
  • Test results and reference filesVerified
  • Recently changed filesFinal transfer in progress

0.042 TBData that currently needs to be transferred

Next story, Transition dayThe new site is ready to start work. →

Transition dayScene 11 / 13

The new site is ready to start work.

The final transfer results for all transfer targets are checked.

Over the past month, data was delivered and the necessary materials were additionally reflected, and work environment validation using actual projects was also carried out at the new site.

The relocation lead approves operation of the new site based on each person's check results.

FINAL TRANSITION REVIEW

Final check before the new site starts work

Data to be transferred
89 TB
Transfer result
100%
Projects in progress
38

Data transfer results

  • Initial 86TB scope transferredCompleted
  • 3TB of new work materials transferredCompleted
  • Changed project files finally reflectedCompleted
  • Final check for untransferred itemsCompleted

Operational readiness results

  • Server and storage accessVerified
  • Running work applicationsVerified
  • Using existing projectsVerified
  • Staff access permissionsVerified
  • Test equipment and work environmentVerified
OPERATIONAL TRANSITIONOperation of the new technical support center approved

From 9 a.m. on the next working day, technical support work is performed at the new site.

Live contextNow

Transition dayWork transition

The new site is ready to start work.

After the final file transfer results and the work environment validation results are checked, the new site becomes the official base of operations.

  • Total transfer scope89.00 TB
  • Data transferred89.00 TB
  • Remaining data0.00 TB
Existing center
Read-only retention
New center
Ready for work
Next task
First working day

NEW TECHNICAL CENTER38 projects

Work environment ready
  • Product testing and validationPrepared
  • Technical analysisPrepared
  • Quality reviewPrepared
  • Technical materials managementPrepared
Next story, First working day at the new sitePast work materials are used here too. →

THE FIRST WORKING DAY

MONDAY, 09:00

At a new location,
last week's work continues.

LAST WORKING DAYExisting site

Product A, Durability test16 / 24

Completed through the 16th test
FIRST WORKING DAYNew site

Product A, Durability test17 / 24

Completed after the 17th test was run

The test equipment and work space have changed, but the results of the tests and analyses carried out through last week continue as they are.

INNORIX in PracticeScene 12 / 13

New siteFirst working day

First working day at the new siteScene 12 / 13

Past work materials are used here too.

At 11 a.m. on the first day of work at the new site, a request arrived asking the quality staff to check the test results of a past product.

They need to check whether a problem similar to one in a current product also occurred in a test performed 5 years ago.

The person in charge finds the test results and technical review materials from that time in the new site's storage and uses them for the work.

FIVE YEARS OF HISTORY, AVAILABLE HERE

Past work can be referenced at the new site as well.

Technical recordsNew Technical Center

Product B, Endurance test, 2021

  • Endurance_Test_Report_2021.pdf2021-06-1824 MB
  • Measurement_Result_2021.dat2021-06-178.4 GB
  • Failure_Analysis_2021.pdf2021-06-2186 MB
  • Reference_Test_Model.step2021-06-23420 MB
TODAY'S ENGINEERING WORKComparing past test results with current test results

Test data created 5 years ago is used today in the quality validation work performed at the new site.

Live contextNow

First working dayNew site

Last week's work continues at the new location.

The 38 projects continue at the new site. Employees do not need to recreate existing design materials and test results.

  • Total transfer scope89.00 TB
  • Data transferred89.00 TB
  • Remaining data0.00 TB
Existing center
Operation ended
New center
Normal work started
Next task
Regular operation

NEW TECHNICAL CENTER38 projects

Existing projects proceeding normally
  • Product testing and validationAvailable
  • Technical analysisAvailable
  • Quality reviewAvailable
  • Technical materials managementAvailable
Next story, One month laterWinding down the existing site →

One month laterScene 13 / 13

Winding down the existing site

A month has passed since work started at the new site.

At the new technical support center, the work previously done at the former site is proceeding normally.

Of the 38 projects in progress at the time of the relocation, some have already been completed and new projects have also started.

After confirming stable operation of the new site, the company begins to clean up the infrastructure of the existing site.

ONE MONTH LATER

FORMER TECHNICAL CENTERExisting technical support center
  • Technical support workEnded
  • Existing business dataRetained separately
  • InfrastructureCleanup in progress
NEW TECHNICAL CENTERNew technical support center
  • Technical support workNormal operation
  • Transferred business dataIn use
  • New projects9 started

Project progress since the relocation

Projects at the time of relocation
38
Projects completed since
12
Projects currently in progress
35

The existing site's data and equipment are cleaned up after the required retention period, work checks and internal approval procedures.

Live contextNow

One month laterNew site

This is now the company's new technical support center.

After stable operation of the new site is confirmed, the infrastructure of the existing site is cleaned up according to the retention policy and approval procedures.

  • Total transfer scope89.00 TB
  • Data transferred89.00 TB
  • Remaining data0.00 TB
Existing center
Infrastructure cleanup
New center
Normal operation
Next task
Ongoing work

NEW TECHNICAL CENTER38 projects

Existing projects proceeding normally
  • Product testing and validationAvailable
  • Technical analysisAvailable
  • Quality reviewAvailable
  • Technical materials managementAvailable

A NEW PLACE TO CONTINUE THE SAME WORK

The place where the work is done has changed,
but the work the company has built up carries on as it is.

LAST MONTHExisting technical support center

Work over the past 8 years
Technical analysis, product testing, quality validation

THIS MONTHNew technical support center

Work that will continue
Existing projects and new technical support work

89 TB
Business data transferred
38
Projects carried on
8 years
Accumulated technical and work records

Companies grow, organizations change, and the places where work is done change too.

But the technology and experience a company has built up over a long time
are not something that must be left behind at a particular site.

Starting work at a new place
does not mean all work has to start from the beginning.