INNORIX in Practice, Inter-Site Transfer

Not every site can use
a stable network.

A company's work does not happen only inside the office.

This is a story about people who work in different network environments and the data they exchange every day.

This is the story of a fictional company that runs sites in different network environments.

MONDAY MORNING08:00

  • HeadquartersLeased line

    Today's work guidelinesDelivering work materials
  • Production facilityPublic internet

    Production and inspection resultsDelivering production data
  • Remote siteWireless

    Field survey dataTransferring while connected
  • Offshore baseSatellite

    Equipment inspection and operation recordsWaiting for connection recovery

The network environments differ, but today, too, work begins at every site.

08:00Morning work begins at every site

INNORIX in PracticeScene 1 / 11

Company backgroundSite environments

Company background / Site environmentsScene 1 / 11

Not every site of this company is in an office.

The company's headquarters uses a stable leased line. The production facility uses the public internet, and the remote site exchanges data with headquarters over a wireless connection.

The offshore base uses satellite communication. The connection status changes with the weather and the network environment, and at times there is no connection for a while.

Each site sends headquarters the data it generates while doing its work in the field. The work guidelines and technical materials prepared by headquarters are also used at each site.

Instead of improving the network at every site to the same level, the company configured INNORIX so that data transfer work can be carried out in each environment.

Company background — Not every site has the same conditions.

This company's work takes place in four locations.

  • HeadquartersCompany operations and technical support

    Leased lineExample of typical connection status

    Work material management, field data analysis, technical support

  • Production facilityProduct manufacturing and quality inspection

    Public internetExample of typical connection status

    Production results, quality inspection records, equipment operation data

  • Remote siteField surveys and measurement

    WirelessExample of typical connection status

    Field photos and video, sensor data, survey results

  • Offshore baseOffshore equipment operation and inspection

    SatelliteExample of typical connection status

    Equipment inspection video, operation records, technical materials

Network quality differs, but each site's work results are used in the operation of the whole company.

Not every site can work under the same conditions.

Live contextNow

Site environmentsCompany background

  • HeadquartersConnected

    Company-wide operationsPreparing work guidelines

  • Production facilityConnected

    Production and quality inspectionGenerating inspection data

  • Remote siteUnstable

    Field surveyGenerating survey data

  • Offshore baseUnstable

    Offshore equipment inspectionGenerating operation records

Next taskMonday, field work begins

Next story, One Monday / 08:00Work begins at each site →

One Monday / 08:00Scene 2 / 11

Today, too, work begins at four sites.

At headquarters, the work guidelines and technical materials for today are ready.

The production facility receives the materials and begins production work. Materials are delivered to the remote site and the offshore base one after another, depending on the connection status.

Each site begins today's work based on the work materials and field operation plans it secured in advance.

Monday, 8 a.m. — A new day begins at every site.

08:00MONDAY MORNING

Work materials for use in the field today

Work materialsUsed atSize
Production plan and quality standardsProduction facility840 MB
Field survey materialsRemote site12.4 GB
Equipment inspection reference materialsOffshore base3.8 GB
  • Production facilityAs of 08:03

    Received
  • Remote siteAs of 08:20

    Receiving
  • Offshore baseAs of 08:20

    Partly received

Each site starts with the work it can do using materials prepared in advance.

Not every site needs its data ready at the same time.

Live contextNow

08:00One Monday

  • HeadquartersConnected

    Delivering work materialsDelivering materials

  • Production facilityConnected

    Production work beginsReceived

  • Remote siteUnstable

    Field survey beginsReceiving

  • Offshore baseUnstable

    Equipment inspection beginsPartly received

Next taskMorning, field work in progress

Next story, One Monday / 09:20The remote site's slowing connection →

One Monday / 09:20Scene 3 / 11

The network at the remote site has worsened.

A field survey is under way at the remote site. New data keeps being generated by the measurement and camera equipment.

From 9:20 a.m., the wireless connection becomes unstable, and the transfer speed of data sent to headquarters drops.

Data generated in the field is kept in local storage. While the network is available, the transfer continues.

Monday, 9:20 a.m. — The data in the field keeps growing.

Over the day, the remote site generates data from measurement equipment, camera equipment and field work systems.

But as the wireless connection becomes unstable from the morning, the amount of data generated in the field and the amount delivered to headquarters begin to differ.

Remote site08:00Connectable

  1. 08:00
  2. 09:20
  3. 11:00
  4. 14:00
  5. 18:30

Data generated in the fieldData delivered to headquarters

Data generated12 GB

Delivered to headquarters9 GB

Data left in the field3 GB

The network has slowed down, but the field survey continues.

The network's condition and the work done in the field are kept separate.

Live contextNow

09:20One Monday

  • HeadquartersConnected

    Checking field dataSome materials received

  • Production facilityConnected

    Production work in progressTransferring normally

  • Remote siteUnstable

    Field survey in progressTransfer speed reduced

  • Offshore baseUnstable

    Equipment inspection in progressTransferring

Next taskField survey continues

Next story, One Monday / 11:40The offshore base that cannot connect →

One Monday / 11:40Scene 4 / 11

The connection to the offshore base has been interrupted.

The satellite connection at the offshore base is temporarily interrupted.

Part of the equipment inspection reference materials being sent from headquarters has not arrived yet. The work materials secured earlier remain in the field.

Offshore base, satellite
Equipment inspection reference materialsWaiting for connection recovery

The field staff put the tasks that need additional materials on hold and carry out the inspection work that can be done with the existing materials.

The transfer that was being sent to that base waits until the connection is restored. Data transfers for the other sites continue.

Monday, 11:40 a.m. — There is a site that cannot be reached.

The satellite connection used at the offshore base has been temporarily interrupted.

The equipment inspection reference materials being sent from headquarters are no longer being delivered either.

11:40Offshore base

SatelliteDisconnected

Equipment inspection reference materials2.2 GB / 3.8 GB

Waiting for recovery

Work that can be done in the field now

  • Review existing operation recordsIn progress
  • Routine equipment inspectionIn progress
  • Inspection that uses additional technical materialsWaiting for materials

Work that can be done in the field continues. Tasks that strictly require the additional materials are put on hold until the materials arrive.

Losing the connection does not mean that all field work stops.

Live contextNow

11:40One Monday

  • HeadquartersConnected

    OperationsWaiting to deliver materials

  • Production facilityConnected

    Production in progressTransferring normally

  • Remote siteUnstable

    Field surveySlow transfer

  • Offshore baseDisconnected

    Inspecting with existing materialsWaiting for connection recovery

Next taskAdditional materials delivered after recovery

Next story, Unplanned work / 13:10Work changes in the afternoon →

At the same time, at other sites

MONDAY, 11:40

It is the same time at the same company.

But the situation is not the same at every site.

  • HeadquartersConnectedAnalyzing field data
  • Production facilityConnectedProduction and inspection work
  • Remote siteUnstable connectionField survey in progress
  • Offshore baseDisconnectedWaiting for some inspection materials

The offshore base's transfer is waiting, but transfer work at the other sites continues.

INNORIX in PracticeScene 1 / 11

Company backgroundSite environments

Unplanned work / 13:10Scene 5 / 11

There is a change to today's equipment inspection plan.

The headquarters technical team has prepared new reference materials for the equipment inspection.

The production facility and the offshore base must use the same revised materials, but the networks at the two sites are currently in different states.

Headquarters technical team13:10

These are the revised materials for this afternoon's equipment inspection. Please check Revision 08.

Production facilityReceived

Offshore baseWaiting for connection

The operations manager checks the version of the revised materials and starts the transfer to each site.

The materials arrive at the production facility first. The transfer to the offshore base waits until a connection becomes available.

Monday, 1:10 p.m. — An unplanned change

Headquarters' work schedule does not wait for the network in the field to improve.

Some of the equipment inspection reference materials for the afternoon have changed.

Headquarters technical team13:10

We have revised the reference materials for this afternoon's equipment inspection.

The production facility and the offshore base, please use the revised materials.

Equipment inspection, Revision 08

Quick

Source
Head Office Server/technical/inspection/revision-08/

Inspection reference files420 MB

Destination

Production Site ServerConnected

/inspection/revision-08/

Offshore Site ServerNot connected

/inspection/revision-08/
13:18, delivery status of the revised materials

Production facilityRevision 08 received

Offshore baseWaiting for connection

Even when the same materials are sent, not every site can receive them at the same time.

Live contextNow

13:10Unplanned work

  • HeadquartersConnected

    Delivering revised materialsRevision 08 ready

  • Production facilityConnected

    Preparing work with new materialsReceived

  • Remote siteUnstable

    Field surveyTransferring field data

  • Offshore baseDisconnected

    Continuing existing workWaiting for new materials

Next taskOffshore base, connection recovery

Next story, Unplanned work / 14:26The site that reconnected →

Unplanned work / 14:26Scene 6 / 11

Communication with the offshore base is possible again.

At 2:26 p.m., the satellite connection is restored.

The interrupted transfer of reference materials continues, and the newly requested revised materials are also processed according to the configured transfer conditions.

The field staff check the version of the latest materials that have been delivered, then start the work they had put on hold.

Monday, 2:26 p.m. — Connected again.

14:26Offshore base

Connection recovered

Satellite connection status
  • Existing equipment inspection reference materials3.8 GB

    58% delivered
  • Revised inspection materials, Revision 08420 MB

    Waiting to transfer
  1. 14:26
  2. 14:48
  3. 15:12

The satellite connection is restored, and the interrupted transfer continues.

The time when a connection is available is used again to move data.

Live contextNow

14:26Unplanned work

  • HeadquartersConnected

    Checking transfer statusConfirming transfer resumed

  • Production facilityConnected

    Production work in progressReceived

  • Remote siteUnstable

    Field surveyTransferring

  • Offshore baseUnstable

    Preparing additional inspectionReceiving resumed

Next taskOffshore base, checking revised materials

Next story, The end of the day / 18:30Data left in the field →

The end of the day / 18:30Scene 7 / 11

The field work is done, but some data has not been delivered yet.

The survey work at the remote site and the equipment inspection at the offshore base have wrapped up.

Over the day, many kinds of measurement data, video and work records were generated in the field. Because of the unstable connection, some data is still left in field storage.

Field data generated today
Production facility100% delivered
Remote site58% delivered
Offshore base40% delivered

Each site keeps the data stored in the field and delivers it to headquarters when transfer is possible.

Headquarters prepares the next day's work by separating the data that has already arrived from the data that has not arrived yet.

Monday, 6:30 p.m. — Data generated in the field today

The field work has wrapped up.

But there is data that has not been delivered to headquarters and remains in field storage.

18:30Today's field work ends

What data is still left in the field?

  • Production facility84 GB

    Delivered to headquarters, 84 GBKept in the field, 0 GB

  • Remote site186 GB

    Delivered to headquarters, 108 GBKept in the field, 78 GB

  • Offshore base120 GB

    Delivered to headquarters, 48 GBKept in the field, 72 GB

Data generated today390 GB

Delivered to headquarters240 GB

Waiting or in progress150 GB

The data left in the field will continue to be delivered whenever a connection is available.

The end of field work and the end of data delivery do not have to happen at the same time.

Live contextNow

18:30The end of the day

  • HeadquartersConnected

    Preparing the next day's workSome results received

  • Production facilityConnected

    Production work endsReceived

  • Remote siteDisconnected

    Field work endsWaiting to transfer

  • Offshore baseUnstable

    Inspection work endsTransferring

Next taskOvernight, field data delivery

Next story, The end of the day / 23:40Time when a connection is available →

The end of the day / 23:40Scene 8 / 11

The network reconnects while people are resting.

The wireless connection at the remote site reconnects. Overnight, the network environment changes several times.

Files that are already complete are not sent again; the remaining data is transferred. If the connection drops, that transfer waits for recovery again.

The offshore base also delivers its remaining operation records and inspection results whenever communication is possible.

Overnight — Time when a connection is available

At the remote site and the offshore base, the network environment changes several times even at night.

When a connection becomes available, transfers take place, and while there is no connection, they wait.

Monday18:30Overnight data delivery

Connectable timeTime without connection

Remote site, remaining data78 GBIn progress or waiting

Offshore base, remaining data72 GBIn progress or waiting

Each time a connection becomes available, the data left in the field decreases.

Field staff do not need to start every transfer themselves.

Live contextNow

23:40The end of the day

  • HeadquartersConnected

    Outside working hoursReceiving field results

  • Production facilityConnected

    Outside working hoursDelivered

  • Remote siteUnstable

    Outside working hoursTransfer resumed

  • Offshore baseUnstable

    Outside working hoursTransferring

Next taskTuesday 08:00, reviewing field results

Next story, The next morning / 08:00Yesterday's field work results →

THE NEXT MORNING

TUESDAY MORNING

The data when we left work yesterday was different from the data when we arrived today.

Monday 18:30240 GBField data arrived at headquarters150 GB, data left in the field
Tuesday 08:00378 GBField data arrived at headquarters12 GB, data not yet delivered

Overnight, another 138GB of data was delivered from the remote site and the offshore base.

INNORIX in PracticeScene 1 / 11

Company backgroundSite environments

The next morning / 08:00Scene 9 / 11

Headquarters checks the work done in the field yesterday.

Work data from the production facility and the remote site has arrived at headquarters.

Most of the inspection records generated at the offshore base have also been delivered. Part of the large video materials is still being transferred.

Headquarters, morning work materials

Production and quality inspection resultsReady

Remote field survey resultsReady

Offshore equipment inspection recordsReady

Offshore high-resolution videoTransferring

The headquarters operations team checks whether all the materials needed for the work report have arrived and identifies the materials that have not arrived yet.

The morning meeting goes ahead based on the work records secured, and the detailed analysis materials are reviewed in addition, in the order they arrive.

Tuesday, 8 a.m. — What happened in the field yesterday?

The headquarters operations team checks the work data generated at each site yesterday.

TUESDAY, 08:00, HEAD OFFICE

Materials for this morning's operations meeting

  • Production reportProduction facility / Monday 17:42

    Ready
  • Quality inspection resultsProduction facility / Monday 18:12

    Ready
  • Field survey dataRemote site / Tuesday 06:48

    Ready
  • Offshore inspection reportOffshore base / Tuesday 03:26

    Ready
  • High-resolution inspection videoOffshore base / Still transferring

    Partly not received
08:30, Headquarters operations meeting

The field work records and inspection results needed for today's meeting are ready. Detailed video analysis of the offshore equipment will proceed after the rest of the materials arrive.

Even if not all data arrives at the same time, the necessary work is identified and started.

Checking the overnight transfer history

RunsLast 24 hours, inter-site transfer jobs

Transfer jobDisconnectionsCurrent status
Production facility, production results0 timesCompleted
Remote site, survey data18 timesCompleted
Offshore base, inspection records27 timesCompleted
Offshore base, inspection video34 timesTransferring

Remote site, survey dataCompleted

  1. Monday 09:20Connection degraded
  2. Monday 18:30Disconnected
  3. Monday 23:40Connection recovered, transfer resumed
  4. Tuesday 06:48Remaining data delivered
This example shows only the main connection and recovery events.

The operations manager checks not only whether the transfers completed, but also what happened during the transfers and which materials have not been delivered yet.

The data arrived at different times, but the company can check the work results of each site.

Live contextNow

08:00The next morning

  • HeadquartersConnected

    Reviewing field resultsReport materials secured

  • Production facilityConnected

    Preparing new workReceived

  • Remote siteUnstable

    Preparing field workReceived

  • Offshore baseUnstable

    Preparing additional inspectionSome video still transferring

Next task08:30, headquarters operations meeting

Next story, How the company changed / 3 months laterOperating methods that differ by site →

THREE MONTHS LATER

And 3 months have passed.

The company began to understand the good times to exchange data at each site
and the times when data is actually needed for work.

Example of the relative distribution of connectable time by site

INNORIX in PracticeScene 1 / 11

Company backgroundSite environments

How the company changed / 3 months laterScene 10 / 11

The same transfer schedule is not applied to every site.

The headquarters operations team reviews the data transfer history at each site over the past 3 months.

They confirmed that the times when each site can connect and the times when data is actually needed for work are different.

The production facility keeps its existing schedule. The remote site is configured to transfer whenever data is generated, and the offshore base separates the transfer jobs for work report materials and for large video.

They began managing transfer schedules and targets to fit each site's work conditions.

3 months later — The same transfer schedule is not applied to every site.

Previously, headquarters operated so that it received each site's data at the same time every day.

But through the experience of the past 3 months, they confirmed that each site needs a different operating method.

Data operations adapted to each site's work

Production facilityPublic internet

Every day, after production work ends

Production results and quality inspection data are delivered on a set schedule.

Remote siteWireless

Whenever field data is ready

Files whose survey is complete are delivered one after another, and transfers wait for recovery when the connection drops.

Offshore baseSatellite

Work records and large video transferred separately

Work reports and inspection recordsWhen ready

High-resolution inspection videoSeparate schedule

The records needed for morning work and the large materials used for detailed analysis are run as separate transfer jobs.

The headquarters operations team's work has changed too.

FlowsData operations by site

Transfer jobRun conditionStatus
Production results deliveryDaily 18:00Active
Quality inspection resultsDaily 18:30Active
Field survey dataWhen files are readyActive
Field work materials deliveryOn requestActive
Offshore inspection recordsWhen records are createdActive
Offshore high-resolution videoSeparate scheduleActive
Headquarters operations manager

It is difficult to keep the network at every site in a normal state at all times.

Instead, we operate by checking which data is needed when, and which data has not yet been delivered from which site.

The way data is operated has also changed to fit each field environment.

Live contextNow

3 months laterHow the company changed

  • HeadquartersConnected

    Reviewing operating policyReviewing history

  • Production facilityConnected

    Running routine workSchedule-based transfer

  • Remote siteUnstable

    Running field workGeneration-based transfer

  • Offshore baseUnstable

    Running offshore workTransfer by material type

Next taskApplying site-specific operating methods

Next story, How the company changed / 1 year laterRunning the new remote site →

How the company changed / 1 year laterScene 11 / 11

The company comes to run a new site in an area with a poor network environment.

The new site is located in an area where stable wired internet is not available.

Based on the operating experience of the existing sites, the company prepares storage space for field data and the materials needed for the work.

It connects a new server and configures data delivery jobs according to the types of field work.

New remote siteNew field serverWireless network environmentField work data transfer begins

As the site begins operating, the data generated in the field starts to be delivered to headquarters whenever a connection is available.

1 year later — The new site also has a poor network environment.

The company decided to start a field business in a new region.

But stable wired internet is not available in this region, and the wireless connection is not consistent either.

NEW SITE PREPARATION

What to prepare to run the new site

The field work environment
  • Field work server
  • Survey and measurement equipment
  • Local data storage
  • Wireless network environment
Materials for use in the field
  • Survey and work guidelines
  • Technical reference materials
  • Measurement and report forms
  • Field work schedule

The operating experience from the existing sites is put to use.

  1. Prepare essential materials before work beginsPrepare field work that can be done even while there is no connection.
  2. Set up storage for field dataSecure space to keep the materials generated while communication is unavailable.
  3. Configure transfer conditions per jobDeliver report materials and large field data separately.
  4. Check transfers after the connection recoversCheck the data that was delivered successfully and the materials still left.

And work began at the new site.

THE FIRST DAY, NEW REMOTE SITE

The first work data has been generated at the new site.

New remote siteWireless network environmentFirst work day, 14:20

Field data generated24 GB

Delivered to headquarters16 GB

Kept in the field8 GB

Headquarters, data received from the new site

First site survey13:26Received

Measurement data13:48Received

Site operation report14:12Received

The new site's network is not perfect either.
But the company already knows how to work in this kind of environment.

The company already has experience running sites in this kind of environment.

Live contextNow

1 year laterHow the company changed

  • HeadquartersConnected

    Supporting new site operationsChecking work results

  • Production facilityConnected

    Production workScheduled transfer

  • Remote siteUnstable

    Field surveyGeneration-based transfer

  • Offshore baseUnstable

    Offshore equipment inspectionTransfer by material type

  • New remote siteUnstable

    Running the new siteDelivering initial data

Next taskWork begins at the new site

TODAY

A year has passed.

Not every site's network
has improved.

The remote site's wireless connection is still unstable.

At the offshore base, the connection still drops even now.

The new site cannot use stable wired internet either.

  • HeadquartersCompany operations and technical support

  • Production facilityProduction and quality inspection

  • Remote siteField surveys and measurement

  • Offshore baseOffshore equipment inspection

  • New remote siteNew field work

Today, too, new data is generated at each site.

While connected, the sites exchange the data they need.

While not connected, they keep the data and wait for the next connection.

Not every place where a company's work happens
has a perfect network.
INNORIX

THE TECHNOLOGY BEHIND THIS STORY

Inter-Site Transfer

INNORIX for moving data between a company's headquarters, production facility, remote sites and offshore base, which run in different network environments.

View product details