When installation files or update packages need to be distributed to multiple servers and branches, you can operate by connecting directly to each target server or storing files on shared storage and preparing the installation files individually.

However, as the number of deployment targets increases, the work of checking which package version was deployed to which server, whether deployment to a specific branch is complete, and which targets failed can also increase.

With INNORIX Flow, centrally prepared installation files and update packages can be transferred to multiple servers and remote branches, and file reflection results for each target can be checked in a single flow.

Package Repository
Distribution Flow
Server A
Branch A
Server B
Branch B
Server C
Branch C

This configuration enables a software distribution flow that connects package preparation → target selection → transfer to each target → file reflection → distribution result check → failed-target response.

Deployment Targets#

The same software package can be transferred to every target, but in real environments, different packages may need to be deployed depending on the server role or operating location.

For example, an installer can be transferred to Windows servers, a compressed deployment file to Linux servers, and an update package together with configuration files to a specific branch.

  • Software Packages
  • Application/
  • application.exeEXE
  • application.tar.gzGZ
  • Update/
  • update-package.zipZIP
  • Configuration/
  • config.jsonJSON
Package Type Use Case
Installation File Install programs on new servers and devices
Update Package Update the version of an existing system
Configuration File Configure environments for servers or branches
Binary Distribute application executable files
Compressed Package Distribute multiple configuration files as a single package

By configuring deployment targets based on file types and target environments, you can manage software distribution tasks consisting of multiple files as well as a single package.

Distribution Method#

Packages can be distributed to multiple targets by transferring them to all targets simultaneously or by deploying them incrementally in a defined order.

For example, you can first transfer an update package to test servers, verify the result, and then deploy it to production servers and remote branches.

  1. Package Ready
  2. Test Servers
  3. Result Check
  • SuccessProduction Servers
  • CheckReview

Conversely, when the same package must be deployed to multiple branches, files can be distributed from one Source to multiple Targets.

Distribution Method Use Case
Simultaneous Deployment Deploy the same package to multiple targets
Sequential Deployment Run the next target after checking the previous target's result
Staged Deployment Separate test and production environments for deployment
Per-Target Deployment Apply different packages to each server or branch
Conditional Deployment Determine the next deployment based on the previous task's result

This allows targets and execution order to be separated according to the actual deployment policy instead of transferring files to every server and branch in the same way.

IT Engineer#

Package Preparation#

Before starting the deployment task, connect the location where installation files or update packages are generated as the Source.

The Source can be configured based on the environment where actual deployment files are prepared, such as a central file server, build server, or package repository.

  • Package Source
  • /release/
  • app-v2.4.zipZIP
  • update-v2.4.zipZIP
  • /config/
  • production.jsonJSON

When configuring the Source, you can check the following items together.

Configuration Item Settings
Package Location Paths to installation and update files
File Selection Files and folders to actually deploy
Version Software version to deploy
File Conditions Specific extensions or file name criteria
Access Scope Permissions to read deployment files

For example, when a new version of a package is generated at /release/latest, you can configure it to transfer that file to multiple deployment targets.

Target Configuration#

Configure each server and branch receiving the package as a Target.

The targets do not need to be the same type of server; they can be configured according to the environments where files are actually reflected, including Windows servers, Linux servers, and remote file servers.

Distribution Targets

  • Seoul OfficeWindows
  • Busan OfficeLinux
  • Data CenterFile Server

Different storage paths can also be used for each target.

Target Example Storage Location
Windows Server C:\Deploy\Package\
Linux Server /opt/deploy/package/
Remote Branch Server /data/update/
File Server /share/software/

This allows the actual file location to be managed according to each target environment even when one package is transferred to multiple targets.

Deployment Flow#

By connecting a Source to multiple Targets, you can distribute a single software package to multiple servers and branches.

The same package can be transferred to multiple targets simultaneously or deployed in a defined order by group.

Software Package

Distribution Flow
  • Server GroupServer 1Server 2
  • Branch GroupSite ASite B
  • Archive

The deployment structure can be configured as follows.

Configuration Use Method
Full Deployment Transfer one package to all targets
Group Deployment Separate servers and branches into groups
Sequential Deployment Run the next group after the previous target is complete
Parallel Deployment Transfer to multiple targets simultaneously
Version-Based Deployment Transfer different packages to each target

This allows multiple targets to be managed within a single deployment flow instead of configuring separate transfer tasks for each server as the number of targets grows.

Execution Conditions#

Package deployment can be started manually by an operator or configured to start automatically when a new version of a file is ready or when the previous task is completed.

Distribution Trigger
New Package
Scheduled
Previous Flow
Distribution Run

[Product UI screen for executing a deployment task based on conditions such as creation of a new package, a specified time, and completion of the previous task]

Execution Condition Use Method
New File Created Automatically deploy after a new package is prepared
Date/Time Deploy on a scheduled basis at the specified time
After Transfer Start the next deployment after the previous task is complete
URL Request Run according to an external deployment request
Manual Run Run manually when the operator needs to

For example, after a new package version is generated on the build server, you can first transfer it to the test server and then deploy it to production servers and remote branches after verification is complete.

Per-Target Check#

When deploying to multiple servers and branches, it is necessary not only to check that the overall task is complete, but also to verify that the package has been successfully reflected on each target.

In Runs, you can check the status of the overall deployment task and, in the details, check the processing result and file transfer status for each target.

  • Distribution Run
  • Server Group A
  • Server 01✓ Completed
  • Server 02✓ Completed
  • Branch Group B
  • Branch 01✓ Completed
  • Branch 02! Check Required
  • Branch Group C
  • Branch 03○ In Progress

The per-target results provide the following information.

Check Item Details
Target Server or branch to which the package was transferred
Target Path File storage location on the target system
Package Deployed installation file or update package
Total Files Number of files transferred
Total Size Total package size
Progress Current transfer progress
Status Deployment status for the target
Completed Task completion time for the target

This allows you to focus on the results of the affected target even when the overall deployment task is complete but some targets require additional review.

Follow-up Tasks#

After the package file has been successfully reflected on the target server or branch, you can connect the next task.

For example, you can run an installation task after the installation file transfer is complete, or connect a task to check the results after an update package has been deployed to all targets.

Package Transfer
Target Verification
Success
Next TaskInstallation, Update, Notification
Check
Review

Follow-up tasks can be connected differently depending on the deployment result.

Deployment Result Next Task
All Targets Complete Run installation or update tasks
Some Targets Complete Check the results for completed targets
Specific Target Requires Review Check the status of the corresponding server or branch
All Files Reflected Notify the responsible person or operating environment
Redistribution Required Rerun the task for the required targets

This creates a flow that goes beyond transferring package files to multiple servers and continues through installation, updates, and operational checks based on the file reflection results.

Exception Handling#

If a package is not successfully deployed to a specific server or branch, you can check the Run details for the affected target instead of rerunning the entire deployment task from the beginning.

For example, if an update package is successfully reflected on other servers but there is a problem with the connection status or Target path of a specific branch, check the target's connection environment and file processing results.

Distribution Run
Target Status ReviewA ✓, B !, C ✓
View DetailsB
Connection
Target Path
Permission
Adjust
Retry
Package Verified

If a problem occurs, you can check the following items together.

Check Item Details Follow-up Action
Target Connection Connection status of the server or branch Check the connection environment
Target Path Location where the package is stored Adjust the path
Access Permissions Whether files can be stored Check permission settings
File Status Transfer result for each package Check the file status
Package Information Version and files for the deployment target Check the version
Execution History Run and per-target processing results Rerun the required task

After the problem is resolved, instead of redistributing the same package to all servers and branches, you can rerun the task for the targets requiring attention and the relevant files.

Through this process, you can build a software package distribution flow that connects package preparation → deployment target configuration → Target connections for each server and branch → execution condition configuration → parallel or staged deployment → per-target result checks → follow-up task connections → exception-target response.

Even when distributing installation files and update packages to multiple servers and remote branches, managing file transfers and per-target processing results centrally based on a single Flow can reduce the work of checking deployment status individually in each environment and connect follow-up actions for the targets that need them.