GLOBAL OPERATIONS & ASSURANCE
Transfers across every site,
every result verified.
From New York HQ to the London office, the Frankfurt data center and cloud storage in Amsterdam. Check the status of file transfers running across sites, and trace the site where a failure occurred and the transfers it affected.
Assurance verifies not only that a file transfer technically completed, but that it met the required time and conditions.
Global Operations
4 Active1 At Risk- Transfers
- 12
- Completed
- 09
- At Risk
- 01
SITE-LEVEL OPERATIONS
From all transfers down to the problem site and file
Check the transfer status of every site in one place, and look into the results of a specific site.
If a transfer was interrupted, see which files on that site completed and which remain incomplete.
Search by file name and open per-device details to determine the scope of the problem.
Studio, Runs
| Transfer | Status | Progress |
|---|---|---|
| New York → London | Waiting | 68% |
| Frankfurt → Amsterdam | Running | 81% |
| San Francisco → Frankfurt | Completed | 100% |
London, Files (3 files)
| File | Result |
|---|---|
| financial-report.zip | Completed |
| analytics-data.csv | Incomplete |
| manifest.json | Pending |
FAULT RECOVERY
When the network recovers, the interrupted transfer continues.
The transfer keeps its state even when the network between sites drops or a server goes offline temporarily.
Once the connection is restored, the transfer resumes from the point of interruption according to the configured policy, without resending files that already completed.
The failure, the recovery attempts and the final result are recorded in the run history.
New York → London
analytics-data.csv100%
Transfer completed68% at interruption
Run history
- Transfer started
- Network disconnected
- Connection restored
- Transfer resumed
- File completed
INTER-SITE ASSURANCE CONTRACT
A completed transfer still fails if it did not meet the agreed conditions.
The Assurance Contract defines the business success conditions: required sites, required files, destination, integrity, completion deadline and more.
Even when a transfer is technically complete, the Contract can fail if a site missed its deadline or a required file is missing.
Assurance Contract3 Destinations, 2 Passed, 1 Failed
- LondonFailedActual06:12Deadline 06:00
- FrankfurtPassedActual05:48Deadline 06:00
- AmsterdamPassedActual05:54Deadline 06:00
London, 12 min overdueContract Failed
OPERATIONS ANALYSIS
Analyze recurring failures and delays, and improve the next transfer.
Check the number of errors, recovery attempts and final result in each site's run history.
Identify network failures and transfer delays that recur at a specific site, and review the schedule and exception policy.
Assurance results reveal not only technical problems but the causes that actually affected business success.
Execution History
Recent runs, last 4 executions
| Date | Errors | Recovery | Result |
|---|---|---|---|
| Nov 09 | 3 | 2 | Failed |
| Nov 08 | 2 | 2 | Passed |
| Nov 07 | 4 | 3 | Failed |
| Nov 06 | 1 | 1 | Passed |
- Repeated issue
- Network interruptions
- Where
- London Office, multiple occurrences
FREQUENTLY ASKED QUESTIONS
Frequently asked questions about
site operations and Assurance
Can I see the transfer status of many overseas sites in one place?
Yes. Studio Runs shows the run status of every site, with results per Flow and per file.
Can I see which files reached a specific site?
Yes. The site's per-device file details show completed and incomplete files, and let you search them.
What happens if the network between sites drops?
According to the configured exception policy, it waits for the connection to recover and then resumes the interrupted transfer.
When a transfer resumes, is every file sent again from the start?
No. Completed files are kept, and recovery targets only the interrupted part or incomplete files.
What does an Assurance Contract verify?
Whether the defined business success conditions were met: required sites and files, destination, integrity, completion deadline and more.
Can the Contract fail even when the file transfer completed?
Yes. Even if every file was delivered, the Contract can fail if the completion deadline was exceeded or a required condition was not met.
Can different deadlines apply to different sites?
Yes. Completion conditions and deadlines can be defined per site in the Contract to match operational requirements.
Can I see failure and recovery history?
Yes. Errors, recovery attempts, the final result and related device status records are available for each run.
Can I find sites where problems keep recurring?
Yes. Compare run history with Assurance results to analyze recurring failures and the causes of delays.
Can Assurance results drive operational improvements?
Yes. Use the causes of Contract failures and the failure history to review schedules, connection status and exception policies.
GET STARTED
Operate transfers across your sites, and verify the success conditions.
Check the transfer status of each site in INNORIX Studio, and manage everything from technical transfer completion to business success with failure recovery and the Assurance Contract.